Time and Work Questions

Multiple choice
  1. Rs. 37.50

  2. Rs. 40

  3. Rs. 60

  4. Rs. 80

Reveal answer Fill a bubble to check yourself
B Correct answer
Explanation

A's rate = 1/6, B's rate = 1/8. In 3 days, A does 3/6 = 1/2, B does 3/8. Total work by A+B = 1/2 + 3/8 = 7/8. C does 1 - 7/8 = 1/8 of the work. C's share = (1/8) * 320 = 40.

Multiple choice
  1. 36

  2. 24

  3. 18

  4. Cannot be determined

  5. None of these

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Calculate the work rates: 1 man = 1/72 work/day, 1 woman = 1/144 work/day, 1 child = 1/180 work/day. In 2 days, 4 men, 12 women, and 20 children complete 2 * (4/72 + 12/144 + 20/180) = 2 * (1/18 + 1/12 + 1/9) = 2 * (2/36 + 3/36 + 4/36) = 2 * (9/36) = 0.5 work. Remaining work is 0.5. To finish in 1 day, 0.5 / (1/72) = 36 men are required.

Multiple choice
  1. Rs. 0

  2. Rs. 500

  3. Rs. 800

  4. Rs. 1,000

  5. None of these

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Work done by A and B in 8 days: 8 * (1/20 + 1/30) = 8 * (5/60) = 2/3. Work done by C and D in 5 days: 5 * (1/40 + 1/60) = 5 * (5/120) = 5/24. Total work done = 2/3 + 5/24 = 21/24 = 7/8. Remaining work = 1/8. Since E does 1/8 of the work, and C does 5/40 = 1/8, they do the same amount of work and get the same pay.

Multiple choice
  1. 30 days

  2. 35 days

  3. 25 days

  4. 40 days

  5. Cannot be determined

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Let total work be 2 units. First half (1 unit) takes time t1, second half (1 unit) takes t2. Rate1 = 3 * Rate2, so t2 = 3 * t1. Total time = t1 + 3t1 = 4t1. If second half was done at Rate1, time would be t1 + t1 = 2t1. 4t1 - 2t1 = 15 days, so 2t1 = 15, t1 = 7.5. Total time = 4 * 7.5 = 30 days.

Multiple choice
  1. 8 days

  2. 10 days

  3. 12 days

  4. 15 days

  5. 16 days

Reveal answer Fill a bubble to check yourself
C Correct answer
Explanation

Efficiency: A=4, B=2, C=1. Total work = (4+2+1)*12 = 84 units. A+B work for 8 days: (4+2)*8 = 48 units. Remaining work = 84-48 = 36 units. A is replaced by C, so B+C work: (2+1) = 3 units/day. Days required = 36/3 = 12 days.