Multiple choice technology testing

What is the status flow of a defect

  1. Open-New-Fixed-Closed

  2. New-Open-Fixed-Closed

  3. Open -Fixed- Closed

  4. None of the Above

Reveal answer Fill a bubble to check yourself
B Correct answer
Explanation

The standard defect lifecycle follows: New (submitted) → Open (acknowledged/assigned) → Fixed (developer resolves) → Closed (tester verifies). The Open-New-Fixed-Closed flow is incorrect because New precedes Open.