Given the following sets of test management terms (v-z), and activity descriptions (1-5), which one of the following best pairs the two sets? v – test control w – test monitoring x - test estimation y - incident management z - configuration control 1 - calculation of required test resources 2 - maintenance of record of test results 3 - re-allocation of resources when tests overrun 4 - report on deviation from test plan 5 - tracking of anomalous test results

  1. v-3,w-2,x-1,y-5,z-4

  2. v-2,w-5,x-1,y-4,z-3

  3. v-3,w-4,x-1,y-5,z-2

  4. v-2,w-1,x-4,y-3,z-5


Correct Option: C

AI Explanation

To answer this question, we need to match the activity descriptions with the corresponding test management terms. Let's go through each option to see which one is the best pairing:

Option A) v-3, w-2, x-1, y-5, z-4

  • Test control (v) is paired with the re-allocation of resources when tests overrun (3) - Incorrect
  • Test monitoring (w) is paired with the maintenance of the record of test results (2) - Correct
  • Test estimation (x) is paired with the calculation of required test resources (1) - Incorrect
  • Incident management (y) is paired with the tracking of anomalous test results (5) - Incorrect
  • Configuration control (z) is paired with the report on deviation from the test plan (4) - Incorrect

Option B) v-2, w-5, x-1, y-4, z-3

  • Test control (v) is paired with the tracking of anomalous test results (5) - Incorrect
  • Test monitoring (w) is paired with the report on deviation from the test plan (4) - Incorrect
  • Test estimation (x) is paired with the calculation of required test resources (1) - Correct
  • Incident management (y) is paired with the maintenance of the record of test results (2) - Incorrect
  • Configuration control (z) is paired with the re-allocation of resources when tests overrun (3) - Incorrect

Option C) v-3, w-4, x-1, y-5, z-2

  • Test control (v) is paired with the re-allocation of resources when tests overrun (3) - Correct
  • Test monitoring (w) is paired with the report on deviation from the test plan (4) - Correct
  • Test estimation (x) is paired with the calculation of required test resources (1) - Correct
  • Incident management (y) is paired with the tracking of anomalous test results (5) - Correct
  • Configuration control (z) is paired with the maintenance of the record of test results (2) - Correct

Option D) v-2, w-1, x-4, y-3, z-5

  • Test control (v) is paired with the maintenance of the record of test results (2) - Correct
  • Test monitoring (w) is paired with the calculation of required test resources (1) - Incorrect
  • Test estimation (x) is paired with the report on deviation from the test plan (4) - Incorrect
  • Incident management (y) is paired with the re-allocation of resources when tests overrun (3) - Incorrect
  • Configuration control (z) is paired with the tracking of anomalous test results (5) - Incorrect

The best pairing of the two sets is Option C, where:

  • v (test control) is paired with 3 (re-allocation of resources when tests overrun)
  • w (test monitoring) is paired with 4 (report on deviation from the test plan)
  • x (test estimation) is paired with 1 (calculation of required test resources)
  • y (incident management) is paired with 5 (tracking of anomalous test results)
  • z (configuration control) is paired with 2 (maintenance of record of test results)

Therefore, the correct answer is Option C.