Multiple choice technology testing

Match the following: (1) Test estimation. (2) Test control. (3) Test monitoring. (a.) measures of tracking process. (b.) effort required to perform activities. (c.) reallocation of resources.

  1. 1-b, 2-c, 3-a

  2. 1-b, 2-a, 3-c

  3. 1-c, 2-a, 3-b

  4. 1-a, 2-b, 3-c

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Test estimation (1) determines the effort required (b) - calculating resources needed. Test monitoring (3) involves measuring and tracking progress (a) - collecting metrics. Test control (2) takes action based on monitoring, including reallocation of resources (c) when deviations occur. The correct matching is 1-b, 2-c, 3-a (option A).

AI explanation

To answer this question, we need to understand the concepts of test estimation, test control, and test monitoring. Let's go through each option to understand why it is correct or incorrect:

Option A) 1-b, 2-c, 3-a - This option is incorrect. Option B) 1-b, 2-a, 3-c - This option is incorrect. Option C) 1-c, 2-a, 3-b - This option is incorrect. Option D) 1-a, 2-b, 3-c - This option is correct.

The correct answer is Option D. This option correctly matches the following:

(1) Test estimation - Effort required to perform activities. (2) Test control - Reallocation of resources. (3) Test monitoring - Measures of tracking process.

Therefore, the correct answer is Option D.