General Awareness ยท Economics
Indian Power and Energy Sector
1,045 Questions
The Indian power and energy sector questions cover nuclear plants, renewable energy targets, and solar missions. These topics are essential for the general awareness preparation of multiple competitive exams. Practice these questions to stay informed about national energy policies.
Nuclear power plantsRenewable energy targetsNational Solar MissionThermal power plantsSmall hydropower generation
Indian Power and Energy Sector Questions
Which of the following is a key factor for the success of inter-state cooperation in energy and power in India?
-
Strong political will
-
Adequate financial resources
-
Technical expertise
-
All of the above
D
Correct answer
Explanation
All of the above are key factors for the success of inter-state cooperation in energy and power in India. Strong political will, adequate financial resources, and technical expertise are all essential for the development and implementation of effective inter-state cooperation mechanisms.
What is the target for India's renewable energy capacity by 2030?
-
100 GW
-
175 GW
-
225 GW
-
300 GW
D
Correct answer
Explanation
India's target for renewable energy capacity by 2030 is 300 GW.
What is the target for India's energy intensity reduction by 2030?
C
Correct answer
Explanation
India's target for energy intensity reduction by 2030 is 20%.
What type of locomotives are used on the Nilgiri Mountain Railway?
-
Steam locomotives
-
Diesel locomotives
-
Electric locomotives
-
Hybrid locomotives
A
Correct answer
Explanation
Steam locomotives are used on the Nilgiri Mountain Railway, as they are able to provide the necessary power and traction to climb the steep gradients.
Which sector in India consumes the most energy?
-
Residential
-
Commercial
-
Industrial
-
Transportation
C
Correct answer
Explanation
The industrial sector is the largest energy consumer in India, accounting for a significant portion of the country's total energy demand.
Which of the following is the primary source of energy in India?
-
Coal
-
Oil
-
Natural Gas
-
Renewable Energy
A
Correct answer
Explanation
Coal is the primary source of energy in India, accounting for over 50% of the country's total energy consumption.
Which sector consumes the largest share of energy in India?
-
Industrial
-
Residential
-
Commercial
-
Transportation
A
Correct answer
Explanation
The industrial sector consumes the largest share of energy in India, accounting for over 40% of the country's total energy consumption.
What is the primary reason for the increasing energy demand in India?
-
Rapid Industrialization
-
Growing Population
-
Urbanization
-
All of the Above
D
Correct answer
Explanation
The increasing energy demand in India is primarily driven by rapid industrialization, growing population, and urbanization.
What is the target for India's renewable energy capacity by 2030?
-
175 GW
-
225 GW
-
300 GW
-
400 GW
D
Correct answer
Explanation
The government of India has set a target of achieving 400 GW of renewable energy capacity by 2030.
What is the name of India's first solar-powered village?
-
Modhera
-
Hiware Bazar
-
Ralegan Siddhi
-
Piplantri
A
Correct answer
Explanation
Modhera in Gujarat became India's first solar-powered village in 2019, with all its households and public buildings powered by solar energy.
What is the name of India's first green building rating system?
-
LEED India
-
GRIHA
-
IGBC Green Homes
-
BEE Star Rating
B
Correct answer
Explanation
GRIHA (Green Rating for Integrated Habitat Assessment) is India's first green building rating system, developed by The Energy and Resources Institute (TERI).
What is the target for renewable energy capacity in India by 2030?
-
100 GW
-
175 GW
-
225 GW
-
300 GW
B
Correct answer
Explanation
The Government of India has set a target of achieving 175 GW of renewable energy capacity by 2030.
Which scheme provides financial assistance to solar power projects in India?
-
Solar Park Scheme
-
Ultra Mega Solar Power Projects Scheme
-
Both of the above
-
None of the above
C
Correct answer
Explanation
The Solar Park Scheme and Ultra Mega Solar Power Projects Scheme both provide financial assistance to solar power projects in India.
What is the minimum capacity of a solar park that is eligible for financial assistance under the Solar Park Scheme?
-
50 MW
-
100 MW
-
150 MW
-
200 MW
A
Correct answer
Explanation
The minimum capacity of a solar park that is eligible for financial assistance under the Solar Park Scheme is 50 MW.
What is the minimum capacity of an ultra mega solar power project that is eligible for financial assistance under the Ultra Mega Solar Power Projects Scheme?
-
500 MW
-
1,000 MW
-
1,500 MW
-
2,000 MW
A
Correct answer
Explanation
The minimum capacity of an ultra mega solar power project that is eligible for financial assistance under the Ultra Mega Solar Power Projects Scheme is 500 MW.