aliensbrain
  • Home
  • Study
  • Quizzes
  • 🎤AI Practicefree
  • Notebooks
  • Community
  • Sign in
  • GK - 2008
  • The entire power 1,980 mw from theTalwandi Sabo Thermal P...
Multiple choice

The entire power 1,980 mw from theTalwandi Sabo Thermal Power Plant project will be procured by

  1. PSEB

  2. PP

  3. WBSEB

  4. None of these

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

The Talwandi Sabo Thermal Power Plant in Punjab was developed to supply power primarily to the Punjab State Electricity Board (PSEB).

Keep practicing — related questions

  • The 1,980 mw Talwandi Sabo Thermal Power Plant was constructed by …………. on Build-Own-Operate basis.
  • 1,980 mw Talwandi Sabo Thermal Power Plant project is expected to be commissioned by ……….
  • In 2008, ____ along with two Chinese power equipment majors — Dong Fang Electric (DEC) and Sepco Electric P...
  • The proposed 1,980 mw Talwandi Sabo Thermal Power Plant is located in which of the following places?
  • Tata Group company that deals in generation of Solar Power
  • Consider the following statements: 1. The thermal power plant of India with the highest installed capacity ...
  • What type of energy transformation takes place in thermal power plants?
  • Consider the following facts: 1. The Shimsa hydroelectric project was the first ever hydro-electric project...
Play the full quiz 🎤 Practise this topic out loud

Practice this topic

  • Indian Power and Energy Sector (1015 questions)
Advertisement
© Aliensbrain | all rights reserved
  • About
  • Contact
  • Terms and Condition
  • Privacy Policy