The 1,980 mw Talwandi Sabo Thermal Power Plant was constructed by …………. on Build-Own-Operate basis.

  1. Sterlite Energy

  2. Sterlite Power Corporation

  3. Punjab Power

  4. None of these

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

The Talwandi Sabo Power Limited (TSPL) project was developed by Sterlite Energy, a subsidiary of Vedanta Limited, on a Build-Own-Operate basis.