The MRP type for FG/SFG is
-
PD
-
ND
-
M0
-
VB
Reveal answer
Fill a bubble to check yourself
C
Correct answer
Explanation
In SAP PP, the MRP type M0 is used for Finished Goods (FG) and Semi-Finished Goods (SFG). This MRP type indicates manual reorder point planning or MRP-based planning depending on configuration. PD is for reorder point planning, ND is for no planning, and VB is for requirements from forecast.
AI explanation
Finished goods and semi-finished goods in this setup use MRP type M0, a planning strategy configured for how these materials' requirements are calculated and planned in MRP runs. PD is the standard MRP-based planning type, ND means no planning, and VB is manual reorder point planning — none of which match how FG/SFG is configured here.