In precise scheduling within SAP, loading time is maintained in hours and minutes (not in days) to allow for precise timing calculations. Pick/pack lead time and transit time have their own handling - transit time is maintained in days, and pick/pack lead time is also typically maintained in days. The key distinction is that loading time requires finer precision (hours/minutes) for accurate scheduling.