  1. ISO/IEC 14143

  2. ISO/IEC 12119

  3. ISO/IEC 15504

  4. ISO/IEC 15939

  5. ISO/IEC 12207

  6. ISO/IEC 15271


Correct Option: F
  1. ISO/IEC 14143

  2. ISO/IEC 12119

  3. ISO/IEC 15504

  4. ISO/IEC 15271

  5. ISO/IEC 12207

  6. ISO/IEC 15939


Correct Option: C
  1. ISO/IEC 14143

  2. ISO/IEC 12119

  3. ISO/IEC 15504

  4. ISO/IEC 15939

  5. ISO/IEC 12207

  6. ISO/IEC 15271


Correct Option: D

Identify the Quality standard : Software measurement

  1. ISO/IEC 14143

  2. ISO/IEC 12119

  3. ISO/IEC 15504

  4. ISO/IEC 15271

  5. ISO/IEC 12207

  6. ISO/IEC 15939


Correct Option: A
  1. The process starting with the terminal modules is called - a. Top-down integration b. Bottom-up integration c. None of the above d. Module integration
  1. Top-down integration

  2. Bottom-up integration

  3. None of the above

  4. Module integration


Correct Option: B

AI Explanation

To answer this question, you need to understand the concepts of top-down integration and bottom-up integration.

Option A) Top-down integration - This option is incorrect because top-down integration starts with the highest-level modules and gradually integrates lower-level modules.

Option B) Bottom-up integration - This option is correct because bottom-up integration starts with the terminal modules (i.e., the lowest-level modules) and gradually integrates higher-level modules.

Option C) None of the above - This option is incorrect because one of the given options is correct.

Option D) Module integration - This option is incorrect because it does not accurately describe the process starting with the terminal modules.

The correct answer is Option B) Bottom-up integration. This option is correct because it accurately describes the process starting with the terminal modules and gradually integrating higher-level modules.

Exit Criterion Determines?

  1. When testing needs to continue

  2. When system is ready for delivery

  3. When testing has been completed

  4. All of the above


Correct Option: C

When testers report to their test managers about their testing effort, the focus should be on

  1. Boundary conditions, state machines, and load generators

  2. Risk management and impact of serious test escapes on the reputation and revenues of the company

  3. a & b

  4. None of the above


Correct Option: C
  1. The adequacy of the test objectives for that level

  2. The adequacy of the test approach

  3. The effectiveness of the testing with respect to its objectives

  4. All of the above


Correct Option: D

The costs involved in testing and quality assurance is ___________ than the costs associated with external failures.

  1. More

  2. Less

  3. Same

  4. Unimaginable


Correct Option: B

AI Explanation

To answer this question, we need to understand the concepts of testing, quality assurance, and external failures.

Testing and quality assurance involve activities aimed at detecting and preventing defects in a product before it is released to customers. These activities typically include testing the product against various scenarios and requirements, identifying and fixing any issues found, and ensuring that the product meets quality standards.

On the other hand, external failures refer to defects or issues that are discovered by customers or users after the product has been released. These failures can result in customer dissatisfaction, product recalls, warranty claims, or even legal issues.

The given statement states that the costs involved in testing and quality assurance are less than the costs associated with external failures. This means that investing in testing and quality assurance upfront to prevent defects is more cost-effective than dealing with the consequences of external failures.

Therefore, the correct answer is:

B) Less

This option is correct because it aligns with the understanding that the costs involved in testing and quality assurance are lower compared to the costs associated with external failures.

  1. Functional testing

  2. Structural testing

  3. Performance testing

  4. Requirements testing


Correct Option: A