What is the activity that immediately follows Review meeting in a Formal review
Fixing Defects
Follow up
Checking Exit criteria
Rework
Person who documents all the issues, problems and open points that were identified during the meeting is:
Author
Manager
Scribe
Reviewer
Static Analysis is also performed using tools:
True
False
Inspection is led by:
Moderator
Co-author
Kick-off in a formal review includes:
Distributing documents
Defining the review criteria
Selecting the personnel
All of the above
Walkthroughs, technical reviews and inspections can be performed within a peer group:
QC is formally known as ------
Test Lab
Test Director
Test Center
Test Plan
QC can be installed on
Windows
Linux
Solaris
All the above
QC Contains
Specify Release and Requirements
Execute Tests
Track Defects
Each Release can contain a number of cycles.