Tag: packaged enterprise solutions

Questions Related to packaged enterprise solutions

  1. Use a Java step

  2. Call History-Add

  3. Use the TaskStatus-Add method

  4. Use a Transition


Correct Option: C
  1. people or groups interested in the progress and resolution of a particular work object, but who do not necessarily perform the work in the application

  2. clusters of associated work objects, usually relating to a single customer.

  3. people or groups who are authorized to perform on restricted types of work objects

  4. users set up in the system that are responsible for the timely resolution of outstanding work objects.


Correct Option: A
  1. The likelihood that a benchmark is to be met

  2. An indication of how likely it is that the work follows the specified path

  3. The likelihood that a goal will be met

  4. The likelihood that a goal will not be met


Correct Option: B
Explanation:

To answer this question, the user needs to understand the concept of adding a Connector to an Assignment.

When adding a Connector to an Assignment, the Likelihood associated with the Action represents the probability or chance that the work will follow the specified path. In other words, it is an indication of how likely it is that the work will be completed as planned and that the specified path will be followed.

Option A is incorrect because the Likelihood associated with the Action does not represent the likelihood that a benchmark will be met. A benchmark is a standard or reference point that is used to measure progress or performance, and it is not directly related to the Likelihood associated with the Action.

Option C is also incorrect because the Likelihood associated with the Action does not represent the likelihood that a goal will be met. Although completing the work as planned may contribute to achieving a goal, the Likelihood associated with the Action only represents the probability or chance that the work will follow the specified path.

Option D is incorrect because the Likelihood associated with the Action does not represent the likelihood that a goal will not be met. The Likelihood associated with the Action is a positive indicator of how likely it is that the work will be completed as planned, and it does not represent the likelihood of failure.

Therefore, the correct answer is:

The Answer is: B. An indication of how likely it is that the work follows the specified path.

  1. An Assignment with three Connector Flow Actions and four Local Flow Actions

  2. A flow that calls more than two sub flows

  3. A flow with four utility shapes linked together

  4. A flow that spans multiple Visio pages


Correct Option: D
  1. The flow will not save

  2. The flow will be suspended

  3. The flow will save,but an execution Java eaception will be raised

  4. The flow will be suspended,and control will be transferred to the FlowProblems flow


Correct Option: D
  1. a synonym for work group

  2. a collection of worklists

  3. a set of assignments for one user, ordered by a Work Object property known as “urgency.”

  4. a pool of work assignments awaiting processing by any of a group of users, rather than a particular user.


Correct Option: D