  1. a. From decision shape of flow rule

  2. b. In an activity you can evaluate the decision table using Property-Map-DecisionTable. By doing so, we can set a property value with the return value of the decision table

  3. c. Decision table can be referred from R-D-E

  4. d. All of the above


Correct Option: D

Which declarative rule is used to run an activity when the value of a specified property changes ?

  1. Declare Expressions

  2. Declare Constraint

  3. Declare Trigger

  4. Declare OnChange


Correct Option: D

Which two functions can be directly configured within a service level rule ?

  1. reset the value of a property, execute an activity upon reaching a deadline

  2. reset the value of a property, generate an error message

  3. reset the value of a property, increase work object urgency upon reaching a goal

  4. execute an activity upon reaching a deadline, increase work object urgency upon reaching a goal


Correct Option: D

What standard class that can be used for an 'Originator' party ?

  1. Data-Operator-Party

  2. Data-Party-Operator

  3. Party-Data-Operator

  4. Party-Operator-Data


Correct Option: A

As a best practice which step should be added to the end of this activity 1. Page-New 2. Obj-Open 3. Property-Set 4. Call UpdateStatus

  1. Page-Remove

  2. Property-Set .pyFlowName to the flow name

  3. Obj-Refresh-And-Lock

  4. Obj-Save


Correct Option: A
  1. Rule-Form-HTML

  2. Rule-Obj-Validate

  3. Property-Validate method

  4. Page-Validate method


Correct Option: B
  1. There are two types of flow actions: ticket and parameter

  2. The system saves data recording an assignment in instances of the Work-Workbasket class or Work-Worklist class

  3. There are two types of flow actions: Connector and Local

  4. The system saves data recording an assignment in instances of the Data-Workbasket class or Data-Worklist class


Correct Option: C

When should the Performance tool (PAL) be used

  1. at the end of each iteration of the Construction Phase

  2. immediately before going into production

  3. whenever a critical change is made to a flow

  4. during UAT


Correct Option: C