Which sector consumes the largest share of energy in India?
-
Industry
-
Transportation
-
Residential
-
Agriculture
A
Correct answer
Explanation
The industrial sector is the largest consumer of energy in India, accounting for over a third of the country's total energy consumption.
What is the target for India's renewable energy capacity by 2030?
-
100 GW
-
200 GW
-
300 GW
-
400 GW
D
Correct answer
Explanation
India has set a target of achieving 400 GW of renewable energy capacity by 2030.
What is the name of India's national energy policy?
-
National Energy Policy 2021
-
National Energy Policy 2015
-
National Energy Policy 2010
-
National Energy Policy 2005
A
Correct answer
Explanation
The National Energy Policy 2021 is the current national energy policy of India.
What is the name of India's national renewable energy agency?
-
National Renewable Energy Agency
-
National Renewable Energy Laboratory
-
National Renewable Energy Institute
-
National Renewable Energy Center
A
Correct answer
Explanation
The National Renewable Energy Agency is India's national renewable energy agency.
What is the name of India's national energy research institute?
-
National Energy Research Institute
-
National Energy Technology Laboratory
-
National Energy Research Center
-
National Energy Institute
A
Correct answer
Explanation
The National Energy Research Institute is India's national energy research institute.
What is the government's target for increasing the share of renewable energy in India's total energy mix under the Atmanirbhar Bharat Abhiyan?
C
Correct answer
Explanation
The government aims to increase the share of renewable energy in India's total energy mix to 30% by 2030 under the Atmanirbhar Bharat Abhiyan.
Which Public Enterprise is responsible for the production and distribution of electricity in India?
-
NTPC Limited
-
Power Grid Corporation of India Limited
-
NHPC Limited
-
Coal India Limited
A
Correct answer
Explanation
NTPC Limited is the largest Public Enterprise in India and is responsible for the production and distribution of electricity.
Which Public Enterprise is responsible for the exploration and production of oil and natural gas in India?
-
Oil and Natural Gas Corporation Limited (ONGC)
-
Indian Oil Corporation Limited (IOCL)
-
Hindustan Petroleum Corporation Limited (HPCL)
-
Bharat Petroleum Corporation Limited (BPCL)
A
Correct answer
Explanation
Oil and Natural Gas Corporation Limited (ONGC) is the largest Public Enterprise in the oil and gas sector in India.
What is the target set by the Government of India for renewable energy capacity by 2030?
-
175 GW
-
225 GW
-
300 GW
-
400 GW
D
Correct answer
Explanation
The Government of India has set a target of achieving 400 GW of renewable energy capacity by 2030.
Which type of tidal power plant is commonly used in India?
-
Barrage type
-
Lagoon type
-
Bulb type
-
Strabo type
A
Correct answer
Explanation
Barrage type tidal power plants are commonly used in India due to their simplicity and cost-effectiveness.
What is the largest tidal power plant in India?
-
Dharoi Tidal Power Plant
-
Gulf of Khambhat Tidal Power Plant
-
Sundareshwar Tidal Power Plant
-
Vembannur Tidal Power Plant
B
Correct answer
Explanation
The Gulf of Khambhat Tidal Power Plant is the largest tidal power plant in India, with a capacity of 750 MW.
What is the total installed capacity of tidal power plants in India?
-
500 MW
-
1000 MW
-
1500 MW
-
2000 MW
B
Correct answer
Explanation
The total installed capacity of tidal power plants in India is approximately 1000 MW.
Which type of tidal power plant is under construction in the Gulf of Kachchh?
-
Barrage type
-
Lagoon type
-
Bulb type
-
Strabo type
A
Correct answer
Explanation
A barrage type tidal power plant is under construction in the Gulf of Kachchh, with a planned capacity of 900 MW.
What is the potential for tidal power generation in the Gulf of Khambhat?
-
500 MW
-
1000 MW
-
1500 MW
-
2000 MW
C
Correct answer
Explanation
The Gulf of Khambhat has the potential to generate up to 1500 MW of tidal power.
Which type of tidal power plant is under consideration for the Sunderbans region?
-
Barrage type
-
Lagoon type
-
Bulb type
-
Strabo type
A
Correct answer
Explanation
A barrage type tidal power plant is under consideration for the Sunderbans region, with a planned capacity of 500 MW.