General Awareness ยท Economics
Indian Power and Energy Sector
1,045 Questions
The Indian power and energy sector questions cover nuclear plants, renewable energy targets, and solar missions. These topics are essential for the general awareness preparation of multiple competitive exams. Practice these questions to stay informed about national energy policies.
Nuclear power plantsRenewable energy targetsNational Solar MissionThermal power plantsSmall hydropower generation
Indian Power and Energy Sector Questions
-
Hindustan Petroleum Corporation Ltd.
-
Bharat Petroleum Corporation Ltd.
-
Crude Distillation unit of Madras Refineries Ltd.
-
Indian Oil Corporation Ltd.
D
Correct answer
Explanation
The refineries at Mathura (Uttar Pradesh), Digboi (Assam), and Panipat (Haryana) are all owned and operated by the Indian Oil Corporation Limited (IOCL), India's largest state-owned oil and gas corporation.
A
Correct answer
Explanation
The Taj Mahal Palace Hotel, commissioned by Jamsetji Tata and opened in 1903, was indeed the first building in Bombay (Mumbai) to be electrified. This was a significant technological advancement for the time, showcasing the Tata family's commitment to modernization and innovation.
-
Tata BP Solar
-
Tata Power
-
Tata Projects
-
All of the Above
-
None of the Above
-
1 & 2 above
F
Correct answer
Explanation
Both Tata BP Solar and Tata Power have been involved in solar power generation. Tata BP Solar was a joint venture for solar manufacturing, while Tata Power has significant solar generation capacity through its Tata Power Renewable Energy Limited (TPREL) subsidiary. The answer refers to both companies working in solar.
-
Assam
-
Gujarat
-
Bihar
-
Maharashtra
A
Correct answer
Explanation
The Numaligarh refinery is located in Assam state, specifically in the Golaghat district. It was established as part of India's efforts to develop refining capacity in the petroleum-rich northeastern region. Assam has been famous for oil since the discovery of oil at Digboi in 1889.
-
Gujarat and Maharashtra
-
Assam and Orissa
-
Kerala and Gujarat
-
Rajasthan and Andhra Pradesh
B
Correct answer
Explanation
India's major petroleum reserves are concentrated in Assam (upper Assam basin) and Odisha (eastern coastal basin). Gujarat has offshore reserves but they're not the 'workable' (economically viable) reserves. Assam has India's oldest and most developed onshore oil fields. Orissa (now Odisha) has significant coastal reserves.
-
Gondwana coal
-
Tertiary coal
-
Cambrian coal
-
Quaternary coal
B
Correct answer
Explanation
Neyveli in Tamil Nadu is famous for its lignite deposits, which belong to the Tertiary geological period (approximately 2-66 million years ago). The Neyveli thermal power station is specifically designed to burn this lignite. Gondwana coal is much older (Permian period), while Cambrian and Quaternary are not relevant coal classifications in India.
-
Haldia, Koyana, Barauni
-
Haldia, Digboi, Barauni
-
Haldia, Digboi, Koyana
-
Digboi. Koyana, Barauni
B
Correct answer
Explanation
All three locations - Haldia (West Bengal), Digboi (Assam), and Barauni (Bihar) - have oil refineries. Digboi has Asia's oldest refinery (1901), Haldia has a modern refinery, and Barauni has a major refinery in eastern India.
-
Barauni
-
Vishakhapatnam
-
Digboi
-
Koyali
D
Correct answer
Explanation
Koyali (near Vadodara, Gujarat) has a major public sector refinery that processes crude oil from Gujarat's offshore and onshore oilfields. The other options are located in different states and refine crude from different sources.
-
Northern India
-
Western India
-
Eastern India
-
Southern India
B
Correct answer
Explanation
Western Region has the largest installed power generation capacity in India, primarily due to presence of states like Gujarat and Maharashtra with significant thermal, renewable, and nuclear power plants. Northern, Eastern, and Southern regions have lower total capacity despite having large states.
-
Thiri Dam Project
-
Nathapa Jhakari Project
-
Kol Dam Project
-
Bhakra Dam
B
Correct answer
Explanation
The Nathpa Jhakri Hydroelectric Project (1500 MW) on the Sutlej River in Himachal Pradesh was India's largest hydroelectric project when completed in 2004-2005. While Tehri Dam is also large, Nathpa Jhakri held the distinction of being the largest operational hydel project at the time.
-
Transport
-
Domestic
-
Agricultural
-
Electric power generation
-
Yantra Park
-
Kalinga Park
-
Synergy Park
-
Banyan Park
B
Correct answer
Explanation
Kalinga Park (TCS Bhubaneswar) received LEED Platinum certification from the US Green Building Council. LEED (Leadership in Energy and Environmental Design) is a prestigious green building certification program.
-
Yantra Park
-
Kalinga Park
-
Synergy Park
-
Banyan Park
B
Correct answer
Explanation
TCS's Kalinga Park in Bhubaneswar achieved LEED Platinum certification from the US Green Building Council. This was TCS's first campus to receive the highest LEED rating for sustainable building design and operations. The other parks (Yantra Park, Banyan Park, Synergy Park) are TCS facilities but Kalinga Park has this specific distinction.
-
Iron
-
Oil & Gas
-
Copper
-
Uranium
B
Correct answer
Explanation
The Godavari-Krishna basin in Andhra Pradesh is famous for its Oil & Natural Gas reserves, particularly in the KG Basin. This region has been a major site for hydrocarbon exploration since the 2000s. It's not particularly known for iron, copper, or uranium reserves, which are found in other parts of India.
-
GAIL
-
BHEL
-
Coal India Ltd
-
HAL
C
Correct answer
Explanation
Coal India Limited was granted 'Maharatna' status in 2011, becoming the fifth PSU after ONGC, IOC, NTPC, and SAIL to receive this elite designation. The Maharatna status gives greater operational and financial autonomy to these large, profit-making public sector enterprises.