MRP (Material Requirements Planning) can be implemented at the Plant Level, for Single items at Single level, and for Single items at Multiple levels depending on organizational needs. The 'All Routings' option is too broad and not a standard MRP implementation scope. MRP systems are designed to be flexible across different levels of production planning.