Multiple choice

On August 23, 2005, an accounting clerk prepared an invoice dated August 31, 2005. Which control can check this?

  1. Range check

  2. Hash total

  3. Size check

  4. Any of the above

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

A range check can verify that a value falls within a predetermined acceptable set of limits, such as checking that an invoice date does not fall prior to the system date or preparation date.