Consider the following objectives:

  1. Flood control
  2. Irrigation
  3. Soil Conservation
  4. Power generation The primary objective of Damodar Valley Project include

  1. 2, 3 and 4

  2. 1, 2 and 4

  3. 2, 4 and 5

  4. 1, 4 and 5

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

The main objective behind the Damodar Valley Cooperation was the flood control. So option 1 is right.

Keep practicing — related questions

  • Consider the following data of Sky Ltd. Cost of machinery purchased on 1 - 4 - 08 : 10, 00, 000 Installatio...
  • Consider the following statement about inhaled air and exhaled air: 1. Exhaled air contains more carbon dio...
  • Consider the given statements. (1) OOP provides security to data using access specifiers. (2) OOP introduce...
  • Directions: Look at the italic part of the sentence. Three possible substitutions (1), (2) and (3) for the ...
  • Directions: Look at the italic part of the sentence. Three possible substitutions (1), (2) and (3) for the ...
  • Directions: Look at the italic part of the sentence. Three possible substitutions (1), (2) and (3) for the ...
  • Directions: Look at the italic part of the sentence. Three possible substitutions (1), (2) and (3) for the ...
  • Directions: Look at the italic part of the sentence. Three possible substitutions (1), (2) and (3) for the ...
Play the full quiz 🎤 Practise this topic out loud
Advertisement
© Aliensbrain | all rights reserved
  • About
  • Contact
  • Terms and Condition
  • Privacy Policy