In the Kraft APAC SAP system, the budget tolerance limit triggers the availability check when commitments exceed the budget by 15% (reaching 115% consumption). This threshold warns users or blocks transactions to prevent uncontrolled overspending. The 20% limit or 90% consumption settings do not match the system design.