Multiple choice technology packaged enterprise solutions

In Kraft batch number of non back flushed material is changed to dummy batch during staging.

  1. True

  2. False

Reveal answer Fill a bubble to check yourself
B Correct answer
Explanation

In SAP production processes, the batch number for non-backflushed materials remains unchanged during staging operations. The system preserves original batch numbers; dummy batches are used only in specific scenarios like GR processing, not staging.

AI explanation

For materials that are not automatically backflushed during production, the staging process assigns them a dummy/placeholder batch number rather than changing their real batch, since backflushing (which would normally consume the actual batch) doesn't happen for these items — so the statement that the batch is changed to dummy during staging is False.