For SPB21 and SPb3 boards, hardware tests at SPU and SPM restart cover testing all SPM SDRAM, and the cache memory is enabled during other tests to be tested indirectly. Thus, 'both a and b' is correct, whereas the Ethernet controller test is not the primary combined option.