When can we start collecting the ROI of an automation testing project?
-
Cost < =Benefit
-
Cost = Benefit
-
Cost > =Benefit
-
Option1 and Option2
D
Correct answer
Explanation
ROI can be collected when benefits equal or exceed costs. Option 1 (Cost ≤ Benefit) includes both equality and benefit exceeding cost. Option 2 (Cost = Benefit) is the break-even point. Since Option 1 already includes the break-even condition, the question frames this as both conditions being relevant for ROI collection.