0

testing Online Quiz - 146

Description: testing Online Quiz - 146
Number of Questions: 20
Created by:
Tags: testing
Attempted 0/20 Correct 0 Score 0

Ideally in which phase of Developement Testing should be started?

  1. Developement phase

  2. Design Phase

  3. Requirement gathering phase

  4. Intergration phase


Correct Option: C

Which of the following is not TCS developed Testing tool?

  1. Sahi

  2. SCEGEN

  3. Testify

  4. Masketeer


Correct Option: A

AI Explanation

To answer this question, let's go through each option to understand which one is not a TCS developed testing tool:

Option A) Sahi - This option is incorrect because Sahi is a testing tool developed by TCS.

Option B) SCEGEN - This option is correct because SCEGEN is not a TCS developed testing tool.

Option C) Testify - This option is incorrect because Testify is a testing tool developed by TCS.

Option D) Masketeer - This option is incorrect because Masketeer is a testing tool developed by TCS.

The correct answer is B) SCEGEN. SCEGEN is not a TCS developed testing tool.

  1. Checking that we are building the right system

  2. Checking that we are building the system right

  3. Performed by an independent test team

  4. Making sure that it is what the user really wants


Correct Option: B

A regression test:

  1. Will always be automated

  2. Will help ensure unchanged areas of the software have not been affected

  3. Will help ensure changed areas of the software have not been affected

  4. Can only be run during user acceptance testing


Correct Option: B
  1. found in the software; the result of an error.

  2. departure from specified behaviour

  3. an incorrect step, process or data definition in a computer program.

  4. a human action that produces an incorrect result.


Correct Option: B

Pick the best definition of quality

  1. Quality is job one

  2. Zero defects

  3. Conformance to requirements

  4. Work as designed


Correct Option: C

Why is software testing important?

  1. Confidence to stakeholders.

  2. Confidence to client that it is bug-free.

  3. zero defects.

  4. Prevent problems of failure in


Correct Option: A

Functional system testing is:

  1. testing that the system functions with other systems

  2. testing that the components that comprise the system function together

  3. testing the end to end functionality of the system as a whole

  4. testing the system performs functions within specified response times


Correct Option: C

What does ‘UAT’ represent?

  1. User Acceptance Testing

    1. User Acceptable Testing
  2. User Acceptance Technology

  3. Useful Acceptance Testing


Correct Option: A
  1. We cannot run the test

  2. It may be difficult to repeat the test

  3. It may be difficult to determine if the test has passed or failed

  4. We cannot automate the user inputs


Correct Option: C

Software testing accounts to what percent of software development costs?

  1. 10-20

  2. 40-50

  3. 70-80

  4. 5-10


Correct Option: B

Which testing methods are used by end-users who actually test software before they use it.

  1. Alpha and Beta Testing

  2. White Box Testing

  3. Black Box Testing

  4. Trial and Error Testing


Correct Option: A

To test a function, the programmer has to write a___, which calls the function and passes it test data

  1. Stub

  2. Driver

  3. Proxy

  4. None of the above


Correct Option: B

Ideally in which phase of Developement Testing should be started?

  1. Developement phase

  2. Design Phase

  3. Requirement gathering phase

  4. Intergration phase


Correct Option: C

Which of the following is not TCS developed Testing tool?

  1. Sahi

  2. SCEGEN

  3. Testify

  4. Masketeer


Correct Option: A

Verification is:

  1. Checking that we are building the right system

  2. Checking that we are building the system right

  3. Performed by an independent test team

  4. Making sure that it is what the user really wants


Correct Option: B

A regression test:

  1. Will always be automated

  2. Will help ensure unchanged areas of the software have not been affected

  3. Will help ensure changed areas of the software have not been affected

  4. Can only be run during user acceptance testing


Correct Option: B

If an expected result is not specified then:

  1. We cannot run the test

  2. It may be difficult to repeat the test

  3. It may be difficult to determine if the test has passed or failed

  4. We cannot automate the user inputs


Correct Option: C
- Hide questions