0

testing Online Quiz - 133

Description: testing Online Quiz - 133
Number of Questions: 20
Created by:
Tags: testing
Attempted 0/20 Correct 0 Score 0

Which of the following Service did IBLc offered for its Customer

  1. Voice Mail

  2. Call Hunting

  3. Distinctive Ringing

  4. All the Above


Correct Option: D

Binding the Order in IBLc will be coming under which Phase

  1. Order Entry

  2. Provisioning

  3. Installation

  4. None of the Above


Correct Option: B

Rogers Currently using Business Lines with___________________ Switching Network

  1. 6 ESS

  2. 5 ESS

  3. 4 ESS

  4. 2 ESS


Correct Option: B

What is the status of a disconnected order in SMP?

  1. Disconnected

  2. Deleted

  3. Suspended

  4. Cancelled


Correct Option: B

A native primary line can have a ported in virtual line

  1. True

  2. False


Correct Option: B

What is IBLc?

  1. Cable product

  2. Wireless Product

  3. Both a & b

  4. None of these


Correct Option: A

Under which technology Rogers performing IBLc Operation.

  1. Leased Copper Loop

  2. Packet Switched Network

  3. Fibre Optic Cables

  4. VOIP


Correct Option: A

IBLc atands for

  1. Internet Business Line over Cable

  2. Individual Business Line over Cable

  3. Internet Base Line over Cable

  4. None of the Above


Correct Option: B

Which of the following Business did Rogers offered for Residential Customers

  1. RHPs

  2. RHPc

  3. IBLs

  4. IBLc


Correct Option: B

In the Disconnect Scenario, the process of dispose the equipments which has been installed in the Product (eMTA) is termed as

  1. Billing Disconnect

  2. Physical Disconnect

  3. Equipment Pickup

  4. All the Above


Correct Option: D

What is the model number for the 4 port eMTA box?

  1. 42G

  2. 504

  3. 68G

  4. None of the above


Correct Option: B

Billing for IBLc product is done in

  1. SGI

  2. AS400

  3. V21

  4. None of the above


Correct Option: C

What is the status message in the row generated when CoS is done

  1. OE Hub completed processing the order

  2. Order has been sent to backend/AS400

  3. Completed Verification

  4. Order has been picked for processing


Correct Option: B

How many new rows will be generated in OE for an disconnected order?

  1. As many rows as the number of disconnected lines

  2. One

  3. No new rows will be generated

  4. As many as the actual lines in the account.


Correct Option: A

MLH stands for

  1. Multiple Line Hardware

  2. Multi Line Hunting

  3. Multi Level Hunting

  4. None of the Above


Correct Option: C

What are the scenarios used in IBLc

  1. Disconnect Scenario

  2. Reactivate Scenario

  3. Change of Service

  4. All the Above


Correct Option: D

Maximum possible lines that IBLc permits for its Business operation

  1. 48 Lines

  2. 72 Lines

  3. 36 Lines

  4. 12 Lines


Correct Option: B

Which of the following Business did Rogers offered for Off Net Commercial Services

  1. IBLs

  2. RHPs

  3. IBLc

  4. All the Above


Correct Option: A

What is the model number for the 8 port eMTA box?

  1. 42G

  2. 504

  3. 68G

  4. None of the above


Correct Option: C

What is the maximum number of eMTA boxes that a cable drop can hold?

  1. 2

  2. 3

  3. 4

  4. 5


Correct Option: B
- Hide questions