0

testing Online Quiz - 132

Description: testing Online Quiz - 132
Number of Questions: 20
Created by:
Tags: testing
Attempted 0/20 Correct 0 Score 0

What is the model number for the 2 port eMTA box?

  1. 42G

  2. 504

  3. 68G

  4. None of the above


Correct Option: A

What is the maximum number of Virtual lines can be added for a primary line?

  1. 1

  2. 2

  3. 3

  4. 4


Correct Option: B

Home phone number needs to be given in the show details window for an IBLc order.

  1. True

  2. False


Correct Option: B

A new row will be generated in OE when an order is revised

  1. True

  2. False


Correct Option: B

Areas which has Physical Cable to address is In-territory whereas Areas which has no Physical Cable to address is Out-territory. In which Territory IBLc offered to Customers?

  1. In-Territory

  2. Out-Territory

  3. Both the Territories

  4. None of the Above


Correct Option: A

What type of contact is to be created in ICM in order to place IBLc order?

  1. Consumer

  2. Business – Cable

  3. Business – Wireless

  4. None of the Above


Correct Option: B

How many types of lines provided for IBLc?

  1. Native

  2. Port-In

  3. All the Above

  4. None of the Above


Correct Option: C

Which refers to Small Business Contract Type in the SGI environment

  1. 1A0

  2. 3C0

  3. 3C1

  4. None of the Above


Correct Option: B
  1. Directory Number Hunting. It ensures incoming call arrives on a busy line, the call is automatically forwarded to the next line.

  2. Dialed Number Hunting. It ensures incoming call arrives on a busy line, the call is automatically forwarded to other areas of lines.

  3. All the Above

  4. None of the Above


Correct Option: A
  1. Call display & Call Waiting

  2. Call display & Call Forward

  3. Virtual Lines & MLH

  4. None of the Above


Correct Option: C
  1. 2-port eMTA

  2. 4-port eMTA

  3. 8-port eMTA

  4. None of the Above


Correct Option: C

Testing to determine if a new software version is performing well enough to accept it for a major testing effort.Identify the type of testing

  1. Basic Testing

  2. Acceptance testing

  3. Usability testing

  4. Sanity Testing


Correct Option: D

Testing of a complete application environment in a situation that mimics real-world use, such as interacting with a database, using network communications, or interacting with other hardware, applications, or systems if appropriate.Identify the type of testing

  1. Beta Testing

  2. User acceptance testing

  3. End-to End testing

  4. System testing


Correct Option: C
  1. Digital box

  2. MTA box

  3. TMA box

  4. None of the above


Correct Option: B
  1. Has both Cable and Wireless Products which are consolidated

  2. Has only Wireless products

  3. Has RHP services & no Wireless Products

  4. All of the above


Correct Option: D
- Hide questions