0

testing Online Quiz - 111

Description: testing Online Quiz - 111
Number of Questions: 20
Created by:
Tags: testing
Attempted 0/20 Correct 0 Score 0

Which one of the following is a complementary product?

  1. MIXTE AFFAIRE SPECIALE

  2. TCD EXPERIENCE RISQUE

  3. ACRI RENTE

  4. TEMPORAIRE EXPERIENCE NON SMOKER


Correct Option: C

What is the operation and transaction for changing the langue of preference for ALICE application?

  1. 240 and 310

  2. 240 and 320

  3. 340 and 310

  4. 340 and 320


Correct Option: C

Full form of SIVAL

  1. Sinival Interdites

  2. Sinistres Invalidites

  3. Singulare Interventione

  4. Sichere Intellecte


Correct Option: B

What is the number and name of the transaction, which is done when further information regarding the medical details and professional details are needed during the creation of the contract?

  1. 100 and Nouvelle Affaire

  2. 250 and Medicale

  3. 750 and Professionale

  4. 700 and Pre Emission


Correct Option: D

In case of SRD product, will we get the contract number at the end of the creation in Phoenix life application?

  1. True

  2. False


Correct Option: B

What are the applications connected to Phoenix Life?

  1. ALICE, ULIS, CIF

  2. SIVAL, ULIS, CIF

  3. ALICE, SIVAL

  4. ALICE, CIF, SIVAL


Correct Option: A

lr_resume_transaction_instance

  1. Resume the status of a transaction instance

  2. Resumes collecting transaction data for performance analysis

  3. Resumes collecting transaction instance data for performance analysis.

  4. None of the above


Correct Option: C

The approach/document used to make sure all the requirements are covered when writing test cases

  1. Test Matrix

  2. Checklist

  3. Test bed

  4. Traceablity Matrix


Correct Option: D

A Non-Functional Software testing done to check if the user interface is easy to use and understand

  1. Usability Testing

  2. Security Testing

  3. Unit testing

  4. Black Box Testing


Correct Option: A
Explanation:

To answer this question, the user needs to know about non-functional software testing and the different types of software testing.

Usability testing is a non-functional software testing that is performed to check if the user interface is easy to use and understand, making option A the correct answer.

Option B, Security testing, is a type of functional software testing that checks if the software system is secure from external threats and internal vulnerabilities.

Option C, Unit testing, is a type of functional software testing that checks if the individual units or components of the software system are working as intended.

Option D, Black Box testing, is a type of functional software testing that checks if the software system is working as intended by testing it without any knowledge of its internal workings.

Therefore, the correct answer is:

The Answer is: A. Usability Testing

Cost of quality = Prevention Cost + Appraisal cost + Failure cost

  1. True

  2. False


Correct Option: B

It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.

  1. Validation

  2. Verification

  3. Quality Assurance

  4. Quality Control


Correct Option: C

AI Explanation

To answer this question, we need to understand the concepts related to quality management.

Option A) Validation - This option is incorrect because validation refers to the process of evaluating a system or component during or at the end of the development process to determine whether it satisfies the specified requirements.

Option B) Verification - This option is incorrect because verification refers to the process of evaluating a system or component to determine whether it meets the specified requirements.

Option C) Quality Assurance - This option is correct because quality assurance is a system of management activities that ensures that the processes used to create a quality product are effective and efficient. It is a preventive process that applies throughout the entire life cycle of the product. Quality assurance focuses on the processes used to create the product, rather than the product itself.

Option D) Quality Control - This option is incorrect because quality control is a process that focuses on the product itself and involves activities such as inspections, testing, and measurements to ensure that the product meets the specified requirements. Quality control is a reactive process that occurs after the product has been created.

The correct answer is C) Quality Assurance. This option is correct because it measures the quality of processes used to create a quality product, is a system of management activities, is a preventive process, applies for the entire life cycle, and deals with process.

Standards and procedures for managing changes in an evolving software product is called?

  1. Confirmation Management

  2. Confederation Mangement

  3. Configuration Management

  4. Compartability Management


Correct Option: C
Explanation:

To answer this question, the user needs to be familiar with software development processes and terminology.

The correct answer is:

C. Configuration Management

Explanation:

Configuration management is the process of managing and tracking changes to software products. It involves identifying, organizing, and controlling changes to the software, hardware, and documentation that make up the product. The goal of configuration management is to ensure that the product remains stable and consistent throughout its development and evolution.

Option A, Confirmation Management, is not a standard term in software development and is not related to managing changes in software products.

Option B, Confederation Management, is not a standard term in software development and is not related to managing changes in software products.

Option D, Compatibility Management, is not the same as configuration management. Compatibility management deals with ensuring that software products work well with other software products and systems. It is not specifically focused on managing changes to a software product over time.

Therefore, the correct answer is C. Configuration Management.

Optimization, Defect Prevention, and Quality Control. Its come under the

  1. CMM Level 2

  2. CMM Level 3

  3. CMM Level 4

  4. CMM Level5


Correct Option: D
Explanation:

To answer this question, the user needs to know about Capability Maturity Model (CMM) and its different levels.

CMM is a framework that defines the key elements required for building and improving software development processes. It provides a structured approach to improve an organization's software development process by defining the stages of a maturity model. There are five levels of CMM, ranging from level 1 to level 5, with each level indicating a higher degree of process maturity.

Now, let's look at each option and determine which one is the correct answer:

A. CMM Level 2: This level is also known as the repeatable level. At this level, the software development process is characterized by basic project management techniques, and successful practices are repeated from project to project. However, it does not include optimization, defect prevention, and quality control.

B. CMM Level 3: This level is known as the defined level. At this level, the software development process is characterized by the existence of a set of defined and documented standard processes and procedures. It includes optimization, defect prevention, and quality control.

C. CMM Level 4: This level is known as the quantitatively managed level. At this level, the software development process is characterized by quantitative management of the process and product. It includes optimization, defect prevention, and quality control.

D. CMM Level 5: This level is known as the optimizing level. At this level, the software development process is characterized by continuous process improvement and optimization. It includes optimization, defect prevention, and quality control.

From the above explanations, it is clear that the correct answer is:

The Answer is: D. CMM Level 5.

Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.

  1. True

  2. False


Correct Option: B

AI Explanation

To answer this question, you need to understand the concept of control charts.

Control charts are a statistical technique used to assess, monitor, and maintain the stability of a process. They are commonly used in quality control to determine if a process is operating within its expected limits and to detect any deviations or changes in the process.

The correct answer is A) True. Control charts are indeed a statistical technique to assess, monitor, and maintain the stability of a process.

Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as

  1. Pareto Analysis

  2. Cause and Effect Diagram

  3. SWOT Analysis

  4. Pie Charts


Correct Option: A

Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC )

  1. True

  2. False


Correct Option: B

The testing which is done by going thro' the code is known as,

  1. Unit Testing

  2. Blackbox testing

  3. White box Testing

  4. Regression testing


Correct Option: C

AI Explanation

To answer this question, you need to understand the different types of testing.

Option A) Unit Testing - This option is incorrect because unit testing involves testing individual components or modules of a software system in isolation, not by going through the code.

Option B) Blackbox Testing - This option is incorrect because blackbox testing focuses on testing the functionality of a software system without any knowledge of its internal workings or code.

Option C) White Box Testing - This option is correct because white box testing, also known as code-based testing or structural testing, involves testing the internal structure or code of a software system to ensure that it functions correctly.

Option D) Regression Testing - This option is incorrect because regression testing is a type of testing that is performed to ensure that previously developed and tested software still works after any changes or modifications have been made.

The correct answer is C) White Box Testing. This option is correct because it refers to the testing that is done by going through the code or internal structure of the software system.

Configuration Management Plan describes the Configuration Management procedures and structures to be used.

  1. True

  2. False


Correct Option: B

Software testing which is done without planning and Documentation is known as

  1. adHoc Testing

  2. Unit Testing

  3. Regression testing

  4. Functional testing


Correct Option: A
- Hide questions