SAP Manufacturing and Production Processes
Quiz covering SAP manufacturing execution topics including Process Orders, Master Recipes, Material Consumption, Backflushing, Inspection Types, PI Sheets, and Net Yield calculations
Questions
(i) DVL recording can be done either manually or through PI sheet, (ii) It creates the Z_PHCON
- (i) True (ii) True
- (i) False (ii) False
- i) True (ii) False
- (i) False (ii) True
Net yield calculation formula is –
- PQ + RU + RP
- PQ - RU + RP
- PQ + RU - RP
- PQ - RU – RP
The PI sheet uses report data to send information to the respective destinations.
- True
- False
Process Orders are released by
- MRP controller
- Production Managers
- Planners
- Production Supervisor
How are the high value materials consumed in the Kraft World
- Backflush
- Manual consumption through PI sheet
- Depends on business decision if to include in PI sheet or to backflush
- Either B or C
The Process Order confirmation in Kraft world for FG is normally done using COR6N transaction
- True
- False
Kraft uses which type of PI sheet
- ABAP based
- Browser based
- All of the above
- None of the above
Procurement type for Phantom material is
- E
- F
- X
- Not maintained
Kraft uses which type of orders in MTI
- Process Orders
- Production orders
- Rework Process Orders
- Both a and c
When are Process Orders released in Kraft
- Daily
- Twice weekly
- Every Wednesday
- Every Friday
Ways of triggering a GI are:
- Manually via an entry in a PI-sheet.
- Automatically via standard SAP backflushing
- Automatically via an interface from a sub-system
- All
Which process message gets generated for the Line Hours Calculation Program?
- Z_PROD
- Z_PHCONS
- Z_MCHRS
- Z_CONS
What is the transaction code used to create sampling scheme?
- QDB1
- QDV1
- QDP1
- QDR1
What is the task list usage used for creation of inspection plan for raw material and packaging material by Kraft?
- Z1
- Z2
- Z3
- Z4
What is the inspection type used for stock relevant inspection lot in RM/PM?
- Z010
- Z011
- Z030
- Z040
Following Inspection type used for Bulk Material – with stock correction functionality
- Z010
- Z011
- Z080
- Z090
There is only one Schedule Margin Key defined in Kraft template, which is –
- 003 (Float before production 1,float after production 1,opening period 1)
- 002 (Float before production 1,float after production 1,opening period 0)
- 001 (Float before production 1,float after production 0, opening period 0
- 000 (Float before production 0,float after production 0, opening period 0)
Which table is used to calculate the Net Yield ?
- ZPP_PO_DATES
- ZPP_PO_REWORK
- ZPP_PO_LINES
- None of the above
Backflush happens when –
- Line Hours job has run
- Net yield program has run.
- DVL program has run,
- Only when all of the above have executed.
Kraft uses Change number to make changes to
- Master recipes
- Process Orders
- Both a and b
- Routing.