Oracle Bills of Material (BOM) and Routing Quiz - Part 9

Test your knowledge of Oracle Bills of Material module including operations, routing, departments, components, substitute items, and manufacturing processes

20 Questions Published

Questions

Question 1 True/False

A Sales order can be imported from other sources.

  1. True
  2. False
Question 2 Multiple Choice (Single Answer)

Price list Contains

  1. Unit Price of the item
  2. Formula
  3. Currency
  4. All of the above
Question 3 Multiple Choice (Single Answer)

What are the pre-requisites for Routing define

  1. Item Creation
  2. Operations
  3. Department
  4. All the above
Question 4 True/False

Oracle WIP , consider Substitute items in pick list

  1. True
  2. False
Question 5 Multiple Choice (Single Answer)

You must define Primary bill or routing before you can define an alternate

  1. NO
  2. YES
  3. Alternate Bill or routing can be created by copy method
  4. Import source method we can
Question 6 Multiple Choice (Single Answer)

Comparing of two bills to identify similarities and differences between them through

  1. Indented BOM
  2. Alternate BOM
  3. CTO
  4. ATO
Question 7 Multiple Choice (Single Answer)

Where do you setup substitute components

  1. In Substitute Components Window
  2. Bill Details Tab
  3. Revision
  4. None of the above
Question 8 True/False

You can create a chain of references of Common Bill

  1. True
  2. False
Question 9 Multiple Choice (Single Answer)

You can use Oracle Bills of Material (BOM) to do the following:

  1. Create and maintain production items
  2. Create and maintain production bills of materials
  3. Create and maintain production resources, departments, routings and lead times
  4. All the above
Question 10 Multiple Choice (Single Answer)

Explain the Maximum number of levels defined in BOM

  1. 60
  2. 64
  3. 66
  4. 70
Question 11 Multiple Choice (Single Answer)

Config BOM Creation Allowed Check Box is selected in BOM Parameters for

  1. OM validation organization that is not a manufacturing organization can be set to No
  2. you plan to manufacture or purchase your configurations
  3. It can be set to No in other organizations where a model BOM exists,but a config BOM is not necessary
  4. All the above
Question 12 Multiple Choice (Single Answer)

Which of the following will not has reference designators

  1. Planning bills and Model
  2. Planning components
  3. Option class
  4. None of the above
Question 13 Multiple Choice (Single Answer)

How do you check BOM circular loops

  1. While creation of BOM Application throws error of items duplidation in levels
  2. While running cost update program
  3. Check for loops program
  4. None of the above
Question 14 True/False

It is not possible to have custom deletion constraints

  1. True
  2. False
Question 15 Multiple Choice (Single Answer)

Deletion Constraints are

  1. BOM
  2. Routing
  3. Components and Operations
  4. All the above
Question 16 Multiple Choice (Single Answer)

BOM workday Calendar which of the following weekly pattern

  1. 4/4/5
  2. 5/4/4
  3. Both Option 1 and 2
  4. 4/4/4
Question 17 Multiple Choice (Single Answer)

Resources types in BOM Departments

  1. PERSON
  2. MACHINE
  3. CURRENCY
  4. All the above
Question 18 Multiple Choice (Single Answer)

While defining Department Instances refers to

  1. No.of resources identified to that particular resource group
  2. No of Operations defined in that department
  3. No of routing in that department
  4. None of the above
Question 19 Multiple Choice (Single Answer)

You cannot enable 24 Hrs available check box while defining Resources in Departments of Oracle Bills of material

  1. Shifts are enabled you cannot
  2. Shifts are not enabled you cannot
  3. Instances are enbaled
  4. UOM is not enabled
Question 20 Multiple Choice (Single Answer)

Whats the difference between standard operations and operations

  1. Similar operations are standard operation can be used by other routing and unique operations particulary to that item/assembly called operations
  2. Similar operations are standard operation cannot be used by other routing and unique operations particulary to that item/assembly called operations
  3. Both Option 1 and 2
  4. None of the above