Oracle Bills of Material (BOM) and Routing Quiz - Part 9
Test your knowledge of Oracle Bills of Material module including operations, routing, departments, components, substitute items, and manufacturing processes
Questions
A Sales order can be imported from other sources.
- True
- False
Price list Contains
- Unit Price of the item
- Formula
- Currency
- All of the above
What are the pre-requisites for Routing define
- Item Creation
- Operations
- Department
- All the above
Oracle WIP , consider Substitute items in pick list
- True
- False
You must define Primary bill or routing before you can define an alternate
- NO
- YES
- Alternate Bill or routing can be created by copy method
- Import source method we can
Comparing of two bills to identify similarities and differences between them through
- Indented BOM
- Alternate BOM
- CTO
- ATO
Where do you setup substitute components
- In Substitute Components Window
- Bill Details Tab
- Revision
- None of the above
You can create a chain of references of Common Bill
- True
- False
You can use Oracle Bills of Material (BOM) to do the following:
- Create and maintain production items
- Create and maintain production bills of materials
- Create and maintain production resources, departments, routings and lead times
- All the above
Explain the Maximum number of levels defined in BOM
- 60
- 64
- 66
- 70
Config BOM Creation Allowed Check Box is selected in BOM Parameters for
- OM validation organization that is not a manufacturing organization can be set to No
- you plan to manufacture or purchase your configurations
- It can be set to No in other organizations where a model BOM exists,but a config BOM is not necessary
- All the above
Which of the following will not has reference designators
- Planning bills and Model
- Planning components
- Option class
- None of the above
How do you check BOM circular loops
- While creation of BOM Application throws error of items duplidation in levels
- While running cost update program
- Check for loops program
- None of the above
It is not possible to have custom deletion constraints
- True
- False
Deletion Constraints are
- BOM
- Routing
- Components and Operations
- All the above
BOM workday Calendar which of the following weekly pattern
- 4/4/5
- 5/4/4
- Both Option 1 and 2
- 4/4/4
Resources types in BOM Departments
- PERSON
- MACHINE
- CURRENCY
- All the above
While defining Department Instances refers to
- No.of resources identified to that particular resource group
- No of Operations defined in that department
- No of routing in that department
- None of the above
You cannot enable 24 Hrs available check box while defining Resources in Departments of Oracle Bills of material
- Shifts are enabled you cannot
- Shifts are not enabled you cannot
- Instances are enbaled
- UOM is not enabled
Whats the difference between standard operations and operations
- Similar operations are standard operation can be used by other routing and unique operations particulary to that item/assembly called operations
- Similar operations are standard operation cannot be used by other routing and unique operations particulary to that item/assembly called operations
- Both Option 1 and 2
- None of the above