What is the use of "Department" on the routing
- For each operation specify a department that determines the resources you may use for that operation
- Collection of resources to represent group of work
- To analyze the impact of modifying resource definition
- None of the above
Grouping of items that are planned and produced together. When you desgin a line, you define it for group and not for individual
- Model
- Product Family
- Standard
- Option class
Applies only to option class bill, which indicates whether you can choose one or many of the options within option class.
- Mutually Exclusive BOM
- Option Class
- Product Family
- Model
What are all the Types of Discrete Jobs in Oracle Applications
- Standard Job
- Non-standard Jobs
- Service Jobs
- Both Option 1 and 2
The schedule group assigned in the Line Scheduling Workbench Options window can be overridden in the Work Order-less Completions window, but only with a schedule group that is associated with a Flow schedule (an not associated with discrete job)
- True
- False
Lot Selection Method appears under the backflush default parameter and affect backflush transactions.Determines how lot controlled Assembly Pull and Component Pull component items are selected during backflush transactions.User can select from any of the below options
- Expire Date
- Manual
- Receipt date
- All the above
Why do you need to define WIP parameters
- to define modes of operation and to assign default values for various work in process functions
- You can only define one set of WIP parameters per inventory organization
- Both option 1 and 2
- None of the above
WIP Supply type Bulk components are backflushed and they default when issuing all components for an assembly
- True
- False
In WIP Paramaters Move transactions check box determines whether you can or cannot add a new operation to a discrete job work in process routing during a move transaction. For example, you may want to add an operation to keep track of rework which you were not expecting
- Allow Creation of New Operations
- Allow Moves Over No Move Shop Floor Statuses
- Require Scrap Account
- None of the above
Which parameters affect backflush Transactions
- Supply Subinventory
- Supply Locator
- Lot Selection Method
- All the above
How lot numbers are assigned to discrete jobs
- By Job Name:
- Based on Inventory Rules
- Both option 1 and 2
- None of the above
What all can you import in WIP module
- Import move transactions from data collection devices, factory floor machines or controllers using the Open Move Transaction Interface
- Import material transactions (component issue/return, assembly completion/return, replenishment) from data collection devices
- Import resource transactions from data collection devices and labor tracking systems using the Open Resource Cost Transaction Interface
- All the above
Work in Process does not implement engineering change orders (ECOs) on non-standard jobs like it does on standard jobs
- True
- False
Creation of WIP Jobs manually from a simulation of job
- Standard Discrete Jobs only
- Non-standard Jobs
- MRP Module Planned Discrete jobs
- None of the above
When I link a sales order to a job in the Discrete Job screen, after I complete this Discrete Job I have my Finish good item reserved in a "Subinventory 1", but I need to transfer it to "Subinventory 2", but I can't transfer because the material is reserved. I use 2 subinventories because one is for inspection and the second is the Sales Subinventory. What should I do
- Profile Option: WIP:Configuration Reservation Level = Items/Subinventory
- Profile Option: WIP:Configuration Reservation Level = Items
- Profile Option: WIP:Configuration Reservation Level = Stock Locators
- None of the above
Item is built on the customer product specifications such as large commercial aircrafts. Such product can not be produces according to existing specifications of the company because some engineering skill is required to incorporate customer specifications in to the design of the final product
- Make to stock
- Make to Order
- Assemble to Order
- Engineer to Order
Explain the field 'Respond to sales order changes' in Oracle WIP parameters = Never
- The corresponding work order will not be placed on hold if you de-link the configured item from the sales order, or if the sales order is placed on hold.
- The work order will be placed on hold if you de-link the configured item from the sales order, or if the sales order is placed on hold.
- The work order will be placed on hold if it is the only work order reserved to that sales order. If there are more than one work orders for the sales order, this will not happen. If you cancel sales order lines with ATO items, this parameter, is ignored b
- None of the above
What is Discrete Manufacturing
- You can define available options in Bills of Material for unique product configurations. You can master schedule models and options and then create work orders to build these unique product configuration in WIP while maintaining control of inventory, plan
- manufacturing is a manufacturing process in which distinct items/products(which you can easily count, see and touch) are built or manufactured in discrete batches on manufacturing floor
- Both option 1 and 2
- None of the above
What is Attribute "Build in WIP"
- it indicates whether to create discrete jobs or repetitive assemblies in Work in Process module
- type attribute for components when you define an item in Item Master Organization
- This attribute is controlled at the Organization level only. When you define an item in Item Master Organization, you can enter the primary subinventory from which to issue (push) or backflush (pull) an item to work in process during manufacturing.
- None of the above
Schedule groups are defined in the Define Schedule Groups window and can be optionally assigned to jobs, in the Discrete Jobs window, or to Flow schedules, in the Line Scheduling Workbench Options window.
- True
- False