IBM Rational Quality Manager (RQM) Testing Fundamentals
Covers RQM test plans, test cases, test execution records (TER), workflow states, defect management, and integration with ClearQuest and order management systems
Questions
What information is captured in the 'order source reference number' in NRIS
- sales order number
- order vector order number
- Non of these
- all
If CO2 is not received into oracle, then check the following table for error details(provided AMG upload/download links are up and running)
- wli_logging.XXRCI_commonlog
- XXRCI.XXRCI_ERROR_TRACKING
- None of the above
- all
Where we need to check the SKU and serial number combination before using them in order creation
- Oracle
- V21
- Both
- None
which of the following details exists in Collaterals (select all the applicable options)
- Item warranty details
- item quantity details
- Shipping details
- consumer details
- all the above
- non of the above
Which section of the test case specifies the Acceptance criteria for a test case to be passed
- Expected result
- Post conditions
- Actual result
- Result
The default initial status of a test case/Test plan
- Ready for review
- Draft
- Under Review
- Approved
Each test case will have a TER
- True
- False
TER Contains
- Environment details
- High level results
- Owner
- Test milestones
- All of the above
CQ can be launched from RQM by
- By clicking on Defects
- By selecting Add new defect from test execution screen
- Both a and b
- None of the above
What is the use of a work item
- To assign Test case
- Allows team members to assign tasks and defects to each other and to view everyone's status
- To assign defects
- None of the above
All the test cases should be linked with a test plan
- True
- False
Users can view test cases from
- Test plan
- Requirements
- Construction
- All of the above
- Only a and b
TER stands for
- Test Execution Result
- Test Execution Record
- Test Environment Report
- None of the above
Severity and priority need to match
- True
- False
various status of a test case
- Passed
- Failed
- blocked
- deferred
- all of the above
- only a and b
A release is equivalent to a RQM ------------------ and a project is equivalent to a RQM ------------
- Project and Test plan
- Test plan and Requirement
- Project and Requirement
- Requirement and test suite
From where can we create and view test plan
- Construction
- Requirements
- Planning
- Builds
In how many ways can we view a test plan
- one
- Three
- two
- five
Which of the following is a state of a Test plan
- Ready for review
- Draft
- Approved
- Retired
- All of the above
Keyword view in Test scripts is used for ---------------
- Writing test steps
- Organizing commonly used steps for reuse
- Viewing the test steps
- none of the above