Software Testing Tools and Methodologies

Covers software testing concepts including Quality Center (QC), IBM Rational Performance Tester (RPT), functional testing, verification techniques, agile testing, and compatibility testing.

20 Questions Published

Questions

Question 1 Multiple Choice (Single Answer)

Which of the following element is not used to validate how well the software performs in Compatibility testing?

  1. Databases
  2. Forward Compatibility
  3. Backward Compatibility
  4. Compatibility of Peripherals
Question 2 Multiple Choice (Single Answer)

Which of the following cannot be detected during functional testing? 1. Response time 2. Reliability 3. Memory leaks

  1. 1. Response time
  2. 1. Response time and 3. Memory Leak
  3. 1. Response time and 2. Reliability
  4. All of the above
Question 3 Multiple Choice (Single Answer)

Testing is not done to __________

  1. Check user friendliness
  2. Improve quality
  3. Find faults
  4. Improve software accuracy
Question 4 Multiple Choice (Single Answer)

Advantage of Agile Testing:

  1. Accept the changing requirements even at the later stages of development
  2. Deliver quality working software frequently from a couple of weeks
  3. Both a and b
  4. None of the above
Question 5 Multiple Choice (Single Answer)

_________ testing verifies all the performance criteria have been achieved when the system is placed into production.

  1. Compliance testing
  2. User acceptance testing
  3. Security testing
  4. System testing
Question 6 Multiple Choice (Single Answer)

Which one is a verification Technique?

  1. Inspection
  2. Unit Testing
  3. System Testing
  4. Acceptance Testing
Question 7 Multiple Choice (Single Answer)

Which is not a Functional Testing tool?

  1. Winrunner
  2. Silk Test
  3. Rational Rose
  4. SQA Robot
Question 8 Multiple Choice (Single Answer)

Fault-based testing is best reserved for:

  1. conventional software testing
  2. operations and classes that are critical or suspect
  3. use-case validation
  4. white-box testing of operator algorithms
Question 9 Multiple Choice (Single Answer)

When was the first Eclipse Based IBM RPT Released?

  1. 2005
  2. 2001
  3. 2002
  4. 2004
Question 10 Multiple Choice (Single Answer)

RPT is Used For…..(Pick the Odd One Out)

  1. Identify the presence and cause of System Performance Bottlenecks.
  2. Automates Identification and management of Dynamic Server Responses.
  3. Collects and Integrates server Resource data with Real time application Performance data
  4. Speeds up the work of Website development by using Ajax with .Net and helps in reducing the page reload
Question 11 Multiple Choice (Single Answer)

RPT Was developed by which among the following?

  1. IBM
  2. IBM/Rational Software
  3. Microsoft
  4. Rational Systems
Question 12 Multiple Choice (Single Answer)

Why RPT Received Criticism in the Earlier Launch?

  1. It finished the amount of work in no time and therefore caused waste of time
  2. It caused huge expenditure
  3. It could not find an issue if a system performance bottleneck exists in an untested area.
  4. The testers were not able to understand the functionality of the Tool
Question 13 Multiple Choice (Single Answer)

Pick the Odd release of RPT from the following:

  1. V6.1
  2. V7.0
  3. V8.1
  4. V6.3
Question 14 Multiple Choice (Single Answer)

Which Citrix Client Version gives the Best results in test using IBM RPT?

  1. Citrix Version 9.200
  2. Citrix Version 11.20
  3. Citrix Version 11.00
  4. Citrix Version 10.34
Question 15 Multiple Choice (Single Answer)

Which release of RPT allows the user to export the RPT test log report to a text file inorder to view it outside the tool?

  1. 7.2.1
  2. 8.1.1
  3. 6.1.3
  4. 8.3.4
Question 16 Multiple Choice (Single Answer)

The Exception of Inactive Process is encountered when:

  1. the Operating system is not installed with the Graphics Driver
  2. The CD-ROM fails to initialise
  3. The Hard Crashes
  4. Max heap Size of JVM(JAVA Virtual Machine) is set to Half of the Installed Memory
Question 17 Multiple Choice (Multiple Answers)

What are the four views called in the requirements module?

  1. Tree,Details,Grid,Coverage analysis
  2. Tree,Details,Tab,Coverage analysis
  3. Tree,Details,Tab,Graph
  4. Tree,Information,Grid,Coverage analysis
Question 18 Multiple Choice (Multiple Answers)

How many custom fields can you create per module in QC?

  1. 10
  2. 999
  3. 99
  4. 50
Question 19 Multiple Choice (Multiple Answers)

What is the site admin application file called?

  1. sabin
  2. qcbin
  3. SA
  4. Siteadmin
Question 20 Multiple Choice (Multiple Answers)

How many memo fields can you add to a module?

  1. 5
  2. 1
  3. 9
  4. 10