Question 1 Multiple Choice (Single Answer)

"____ is a documented method for how a process owner/team should respond to any out-of-control conditions that may occur in a process"

  1. Documentation
  2. Monitoring
  3. Control Charts
  4. Response Plan
Question 2 Multiple Choice (Single Answer)

"The following are Customer Research Toolexcept _____"

  1. Surveys
  2. Interviews
  3. Listening Post
  4. FMEA
Question 3 Multiple Choice (Single Answer)

____ represents the voice of the process

  1. Specification Limits
  2. Control Limits
  3. Targets
  4. None of above
Question 4 Multiple Choice (Single Answer)

____ tool is used to compare a sample mean to a specified value in Hypothesis testing

  1. 1 Sample t-Test
  2. 2 Sample t-Test
  3. Analysis Of Variance (ANOVA)
  4. Chi Square test
Question 5 Multiple Choice (Single Answer)

________ tool is used to Organize Customer Needs

  1. Affinity Diagram
  2. Customer Segmentation
  3. Consensus
  4. Sampling
Question 6 Multiple Choice (Single Answer)

________ type of Design is used to study the vital few X variables and all possible interactions in DOE

  1. Screening Experiments
  2. Fractional Factorials
  3. Full Factorials
  4. None of above
Question 7 Multiple Choice (Single Answer)

________ type of sub-process mapping, we can use icons/pictures

  1. alternate path flowchart
  2. Process Flowchart
  3. Deployment flowchart
  4. cross-functional map
Question 8 Multiple Choice (Single Answer)

_________ is a tool for testing solutions in Improve phase

  1. Simulation
  2. CAP
  3. Cost Benefit Analysis
  4. FMEA
Question 9 Multiple Choice (Single Answer)

_________is used to make predictions of process performance Y, based on a given value of the process or input variable, X.

  1. Cause effect diagram
  2. Regression equation
  3. Run Chart
  4. DOE
Question 10 Multiple Choice (Single Answer)

______tool is used to prioritize Xs

  1. CAP
  2. FMEA
  3. Control Impact Matrix
  4. TRIZ
Question 11 Multiple Choice (Single Answer)

6 sigma process means

  1. LSL & USL are three standard deviations away from the mean
  2. Six standard deviations between LSL & USL
  3. Six standard deviations between mean and farthest specification limit
  4. 12 standard deviations between LSL and USL
Question 12 Multiple Choice (Single Answer)

A "SMART" Goal is

  1. Specific, Measurable, Ambitious, Realistic, Timebound
  2. Specific, Measurable, Attainable, Realistic, Timebound
  3. Special, Measurable, Attainable, Realistic, Timebound
  4. Special, Measurable, Ambitious, Realistic, Timebound
Question 13 Multiple Choice (Single Answer)

A chart that depicts the frequencies of measured data

  1. Run chart
  2. Histogram
  3. Check Sheet
  4. Process Map
Question 14 Multiple Choice (Single Answer)

A detailed plan of key steps and dates are defined in

  1. Goal Statement
  2. Project Scope
  3. Project Milestones
  4. Problem Statement
Question 15 Multiple Choice (Single Answer)

A developer is developing Login Page for Company portal. To avoid Unauthentic login he puts Login Id as Employee number and validates with the Employee database. This is called as

  1. Inspection
  2. Error Proofing
  3. Potential Problem Analysis
  4. Robust System
Question 16 Multiple Choice (Single Answer)

A distribution in which most of the data points are concentrated around the average (mean), thus forming a bell-shaped curve

  1. Pareto Chart
  2. Normal Distribution
  3. Standard Deviation
  4. Scatter Diagram
Question 17 Multiple Choice (Single Answer)

A fluctuation caused by inherent factors resulting in a steady but random distribution of output around the average of the data:

  1. Special Cause Variation
  2. Total Observed Variation
  3. Common cause Variation
  4. Unexplained Variation
Question 18 Multiple Choice (Single Answer)

A GB is having 3 factors X1, X2 and X3. Factors X1 and X2 are having 3 levels and the factor X3 is having 4 levels. What should be the number of trials?

  1. 10
  2. 16
  3. 36
  4. 13
Question 19 Multiple Choice (Single Answer)

Which one of the following is not carried out in Improve?

  1. Generation of solutions
  2. Testing of solution
  3. Handover to process owner
  4. Selection of solutions
Question 20 Multiple Choice (Single Answer)

Which one of the following is not considered as a Tangible Benefit

  1. Cost Avoidance
  2. Incremental revenue
  3. Cost Savings
  4. Interest
Question 21 Multiple Choice (Single Answer)

Which one of the following is not needed for Analyzing the data

  1. Box Plot
  2. Histogram
  3. COPIS
  4. Pareto
Question 22 Multiple Choice (Single Answer)

Which one of the following is not true

  1. Control limits are given by customer
  2. Control limits are calculated from the data
  3. Control limits change when there is a significant change in the process
  4. Control limits represent the voice of the process
Question 23 Multiple Choice (Single Answer)

Which one of the following is TRUE?

  1. Continuous data gives more understanding of the process
  2. Discrete data gives more understanding of the process
  3. Neither is good to understand a process
  4. Discrete data is always repeatable
Question 24 Multiple Choice (Single Answer)

Which one of the following is TRUE?

  1. Smaller the variation, less the chances of defect occurrence
  2. Smaller the mean, smaller will be the Process Sigma
  3. Smaller the standard deviation, larger will be the process variation
  4. Smaller the mean, smaller will be the variation
Question 25 Multiple Choice (Single Answer)

ZLT =

  1. Zst + 1.5
  2. Zst - 1.5
  3. Zst
  4. 6 Sigma