Six Sigma Green Belt Certification Exam - 1
Six Sigma Green Belt Certification Exam
Questions
"____ is a documented method for how a process owner/team should respond to any out-of-control conditions that may occur in a process"
- Documentation
- Monitoring
- Control Charts
- Response Plan
"The following are Customer Research Toolexcept _____"
- Surveys
- Interviews
- Listening Post
- FMEA
____ represents the voice of the process
- Specification Limits
- Control Limits
- Targets
- None of above
____ tool is used to compare a sample mean to a specified value in Hypothesis testing
- 1 Sample t-Test
- 2 Sample t-Test
- Analysis Of Variance (ANOVA)
- Chi Square test
________ tool is used to Organize Customer Needs
- Affinity Diagram
- Customer Segmentation
- Consensus
- Sampling
________ type of Design is used to study the vital few X variables and all possible interactions in DOE
- Screening Experiments
- Fractional Factorials
- Full Factorials
- None of above
________ type of sub-process mapping, we can use icons/pictures
- alternate path flowchart
- Process Flowchart
- Deployment flowchart
- cross-functional map
_________ is a tool for testing solutions in Improve phase
- Simulation
- CAP
- Cost Benefit Analysis
- FMEA
_________is used to make predictions of process performance Y, based on a given value of the process or input variable, X.
- Cause effect diagram
- Regression equation
- Run Chart
- DOE
______tool is used to prioritize Xs
- CAP
- FMEA
- Control Impact Matrix
- TRIZ
6 sigma process means
- LSL & USL are three standard deviations away from the mean
- Six standard deviations between LSL & USL
- Six standard deviations between mean and farthest specification limit
- 12 standard deviations between LSL and USL
A "SMART" Goal is
- Specific, Measurable, Ambitious, Realistic, Timebound
- Specific, Measurable, Attainable, Realistic, Timebound
- Special, Measurable, Attainable, Realistic, Timebound
- Special, Measurable, Ambitious, Realistic, Timebound
A chart that depicts the frequencies of measured data
- Run chart
- Histogram
- Check Sheet
- Process Map
A detailed plan of key steps and dates are defined in
- Goal Statement
- Project Scope
- Project Milestones
- Problem Statement
A developer is developing Login Page for Company portal. To avoid Unauthentic login he puts Login Id as Employee number and validates with the Employee database. This is called as
- Inspection
- Error Proofing
- Potential Problem Analysis
- Robust System
A distribution in which most of the data points are concentrated around the average (mean), thus forming a bell-shaped curve
- Pareto Chart
- Normal Distribution
- Standard Deviation
- Scatter Diagram
A fluctuation caused by inherent factors resulting in a steady but random distribution of output around the average of the data:
- Special Cause Variation
- Total Observed Variation
- Common cause Variation
- Unexplained Variation
A GB is having 3 factors X1, X2 and X3. Factors X1 and X2 are having 3 levels and the factor X3 is having 4 levels. What should be the number of trials?
- 10
- 16
- 36
- 13
Which one of the following is not carried out in Improve?
- Generation of solutions
- Testing of solution
- Handover to process owner
- Selection of solutions
Which one of the following is not considered as a Tangible Benefit
- Cost Avoidance
- Incremental revenue
- Cost Savings
- Interest
Which one of the following is not needed for Analyzing the data
- Box Plot
- Histogram
- COPIS
- Pareto
Which one of the following is not true
- Control limits are given by customer
- Control limits are calculated from the data
- Control limits change when there is a significant change in the process
- Control limits represent the voice of the process
Which one of the following is TRUE?
- Continuous data gives more understanding of the process
- Discrete data gives more understanding of the process
- Neither is good to understand a process
- Discrete data is always repeatable
Which one of the following is TRUE?
- Smaller the variation, less the chances of defect occurrence
- Smaller the mean, smaller will be the Process Sigma
- Smaller the standard deviation, larger will be the process variation
- Smaller the mean, smaller will be the variation
ZLT =
- Zst + 1.5
- Zst - 1.5
- Zst
- 6 Sigma