What are the various deliverables for OAT?

  1. Consolidated OA Checks OAT Plan OAT Strategy OAT Results Closure Report

  2. OAT Strategy WBS OAT Plan OAT Results Closure Report

  3. OAT Strategy Consolidated OA Checks OAT Plan OAT Results Closure Report

  4. WBS OAT Strategy OAT Results Waiver Report Closure Report


Correct Option: C
  1. test management & control,

  2. test specifications & design,

  3. test execution & logging,

  4. performance & monitoring


Correct Option: B

Tools like change Man, Clear case are used as

  1. functional automation tools

  2. performance testing tools

  3. configuration management tools

  4. none of the above.


Correct Option: C

The selection of test cases for regression testing

  1. Requires knowledge on the bug fixes and how it affect the system

  2. Includes the area of frequent defects

  3. Includes the area which has undergone many/recent code changes

  4. All of the above


Correct Option: D

We can achieve complete statement coverage but still miss bugs because:

  1. The failure occurs only if you reach a statement taking the TRUE branch of an IF statement, and you got to the statement with a test that passed through the FALSE branch.

  2. The failure depends on the program's inability to handle specific data values, rather than on the program's flow of control.

  3. Both A and B

  4. We are not required to test code that customers are unlikely to execute.


Correct Option: C

AI Explanation

To answer this question, we need to understand what statement coverage is and why it may not be sufficient to identify all bugs.

Statement coverage is a metric used in software testing to measure the percentage of statements in a program that have been executed during testing. The goal of achieving complete statement coverage is to ensure that every statement in the code has been executed at least once.

Option A states that even with complete statement coverage, bugs may still be missed if the failure occurs only when a specific condition is met. For example, if there is an IF statement in the code and the failure occurs only when the TRUE branch of the IF statement is executed, but the test cases used for coverage only pass through the FALSE branch, then the bug may be missed.

Option B states that the failure may depend on the program's inability to handle specific data values. This means that even if all statements are covered, bugs may still be missed if the failure occurs due to the program not handling certain data values correctly. For example, if the program crashes or produces incorrect results when a specific input value is provided, but the test cases used for coverage do not include that specific value, then the bug may be missed.

Option C correctly states that both Option A and Option B are valid reasons why bugs may be missed even with complete statement coverage. Both the failure occurring only when specific conditions are met and the program's inability to handle specific data values can result in bugs being missed.

Option D is incorrect because it suggests that not testing code that customers are unlikely to execute is a reason why bugs may be missed. While it is true that testing code that is more likely to be executed by customers is generally prioritized, it does not directly relate to the question of achieving complete statement coverage and missing bugs.

Therefore, the correct answer is Option C. Both Option A and Option B are valid reasons why bugs may be missed even with complete statement coverage.

Typical defects that are easier to find in reviews than in dynamic testing are:

  1. deviations from standards,

  2. requirement defects,

  3. design defects,

  4. insufficient maintainability and incorrect interface specifications.

  5. All of the above.


Correct Option: E

Which term describe appropriately the mail functionality of QC ?

  1. Test case

  2. Repository

  3. Load test

  4. Defects


Correct Option: B

What type of tests make up test set ?

  1. Smoke & Integration

  2. Smoke & Automated

  3. Integration & Manual

  4. Manual & Automated


Correct Option: D

At what level is a main test set tree folder ?

  1. Root

  2. main

  3. subject

  4. unattached


Correct Option: A
  1. a folder of test result

  2. a folder of testing cycle

  3. a group of tests to achieve goal

  4. a group of test assigned to a release


Correct Option: C
  1. hierarchical relationship between requirement

  2. The number of test plan needed for each requirement

  3. Identify defects that are associated with each requirement

  4. Which release and or cycles are linked to each requirement


Correct Option: A

From which QC module, does the Testing process start ?

  1. Defect

  2. Release

  3. Dashboard

  4. Requirement


Correct Option: B

When defects are exported out of QC, what type of file created?

  1. .xls

  2. .qcd

  3. .doc

  4. .mdb


Correct Option: A

What is tracked when a defect is assigned a status ?

  1. Priority

  2. Severity

  3. Life cycle

  4. User assigned


Correct Option: C

How many views are available in Defect Module ?

  1. one

  2. Two

  3. Three

  4. Four


Correct Option: A

AI Explanation

To answer this question, you need to understand the Defect Module in the context it is being referred to. The Defect Module is commonly used in software testing or bug tracking systems to track and manage reported defects or issues.

In the Defect Module, views are typically used to provide different perspectives or filters on the defects data. Each view can display a subset of the available defects based on specific criteria or conditions.

According to the question, the correct answer is A) one. This means that there is only one view available in the Defect Module. This single view may provide a comprehensive overview of all the defects or may be pre-filtered to show specific categories or priorities of defects.

It's important to note that the number of available views in a Defect Module can vary depending on the specific bug tracking or testing system being used. Some systems may offer multiple predefined views, while others may allow users to create custom views based on their specific needs.

  1. Name & History

  2. Name & Description

  3. Summary & History

  4. Summary & Description


Correct Option: D

From which modules, one can log defect ?

  1. Defect

  2. Requirement & Defect

  3. Requirement, Test Plan, Defect

  4. Requirement, Test Plan, Test lab, Defect


Correct Option: D
  1. Audit tab in the Defect module

  2. Status column in defect grid

  3. History tab in the Defect module

  4. Summary column in the Defect grid


Correct Option: C
  1. All cycles

  2. Only 1st cycle

  3. Only last cycle

  4. none of cycle


Correct Option: A