🎴 Flashcard Mode

Quality Center Testing Fundamentals

Card1 / 20
Mastered0
Review0
QuestionClick to flip

What are the various deliverables for OAT?

AnswerClick to flip back
A
OAT Strategy Consolidated OA Checks OAT Plan OAT Results Closure Report
💡 Explanation:

The complete OAT deliverable set includes: OAT Strategy (high-level approach), Consolidated OA Checks (verification criteria), OAT Plan (detailed test plan), OAT Results (test outcomes), and Closure Report (sign-off). Options A and B are missing key elements, and Option D incorrectly includes WBS and Waiver Report instead of required deliverables.

Change Mode