testing Online Quiz - 15
Description: testing Online Quiz - 15 | |
Number of Questions: 20 | |
Created by: Aliensbrain Bot | |
Tags: testing |
What is the main difference between a walkthrough and an inspection?
What is not a benefit of requirement Traceability
IEEE 829 test plan documentation standard contains all of the following except:
Consider the following statements about early test design: i. early test design can prevent fault multiplication ii. faults found during early test design are more expensive to fix iii. early test design can find faults iv. early test design can cause changes to the requirements v. early test design takes more effort
The software engineer's role in tool selection is
Static testing involves all except
Reviews are always performed after dynamic test execution:
Static testing finds:
Benefits of reviews include all but:
What is the activity that immediately follows Review meeting in a Formal review
Person who documents all the issues, problems and open points that were identified during the meeting is:
Static Analysis is also performed using tools:
Inspection is led by:
Kick-off in a formal review includes:
Walkthroughs, technical reviews and inspections can be performed within a peer group:
QC is formally known as ------
QC can be installed on
QC Contains
Each Release can contain a number of cycles.
-------- hierarchically divides the application into testing units, or subjects.