A job may not run at the same time with another job. This is related to

  1. Negative dependency

  2. Mutually exclusive jobs

  3. Positive dependency

  4. Conditional requirement


Correct Option: A,B

A job can run only after the job it has negative dependency. State whether this statement is true.

  1. True

  2. False


Correct Option: B

Time specified for a requirement job will identify how far the actual job can look back to see if the requirement job has finished its run.

  1. LEADTM

  2. QTM

  3. COMPTM

  4. WAITTM


Correct Option: A

The time, which indicates how long the job (after has come into the any CA7 queue) will be in the queue before it is considered late.

  1. LEADTM

  2. QTM

  3. COMPTM

  4. WAITTM


Correct Option: B

A triggers B and C. C have requirements of D and E. What will happen if E completes.

  1. Triggers A

  2. Triggers B

  3. Triggers C

  4. None of these


Correct Option: D

A triggers B and C. C have requirements of D and E. What will happen if A completes, D and E are active.

  1. B and C are not triggered.

  2. B is active, C is not triggered.

  3. B is active, C is in REQ queue

  4. B and C in RDY queue.

  5. B and C in REQ queue


Correct Option: C

B has a requirement of A with lead time of 2 hours. B was triggered at 8:00 AM and is active. What should be the minimum time at which A might have completed.

  1. 6:00 AM

  2. 5:59 AM

  3. 6:01 AM

  4. Could be any time as the run time of A is not specified. Question needed additional information.


Correct Option: D

B has a requirement of A with lead time of 2 hours. B was triggered at 8:00 AM and is active. What should be the minimum time at which A might have started.

  1. 6:00 AM

  2. 5:59 AM

  3. 6:01 AM

  4. Could be any time as the run time of A is not specified. Question needed additional information.


Correct Option: C

A triggers B and C. C have requirements of D and E. What will happen if A completes, D is complete and E in abend status.

  1. B and C are not triggered.

  2. B is active, C is in REQ queue.

  3. B and C in REQ queue.

  4. B is active, C is in RDY queue.

  5. B and C in RDY queue.


Correct Option: B

What is the prefix character for symbolic parameter ?

  1. %

  2. &

  3. *

  4. @


Correct Option: B

How can a job’s execution priority be modified ?

  1. PRIQTY parameter

  2. PRTY parameter

  3. JOBCLASS parameter

  4. RUNTIME parameter


Correct Option: B

What is the purpose of REGION key word ?

  1. specifies the amount of space required by a step

  2. specifies the amount of space required by a job

  3. both of the above

  4. none of the above


Correct Option: C

How can a stopped job be started again? - JCL

  1. Through the RETURN parameter

  2. Through the STARTUP parameter

  3. Through the RESTART parameter

  4. Through the CHECKPNT keyword


Correct Option: C

How can values be passed from the job stream to an executable program?

  1. Through the PARM keyword

  2. Through the VALUE parameter

  3. Through the PGM parameter

  4. All of the above


Correct Option: A

What statement marks the beginning of an in-stream or cataloged procedure in JCL and assigns default values to parameters defined in the procedure?

  1. STREAM

  2. SET

  3. PROC

  4. PEND


Correct Option: C

AI Explanation

To answer this question, you need to understand the concept of procedures in JCL (Job Control Language).

Option A) STREAM - This option is incorrect because "STREAM" is not a statement that marks the beginning of a procedure in JCL.

Option B) SET - This option is incorrect because "SET" is not a statement that marks the beginning of a procedure in JCL.

Option C) PROC - This option is correct. The "PROC" statement marks the beginning of an in-stream or cataloged procedure in JCL. It is followed by the name of the procedure and may include parameters. The PROC statement assigns default values to these parameters.

Option D) PEND - This option is incorrect. The "PEND" statement is used to mark the end of a procedure in JCL, not the beginning.

The correct answer is C) PROC. This option is correct because the PROC statement is used to mark the beginning of a procedure in JCL and assigns default values to parameters defined in the procedure.

What is the table name to see IBS ordering days

  1. IBS_ORDR_ST_DTL

  2. LOB_ORDR_TYP_DMN

  3. IBS_ORDR_ST_DTL_H

  4. None


Correct Option: A

Choose any one answer from the multiple choice

  1. Home

  2. Auto

  3. Both

  4. None


Correct Option: B

Choose any one answer from the multiple choice

  1. Home & Fire

  2. Boat, Umbrella & Fire

  3. Home, Fire & Umbrella

  4. Home, Fire, Umbrella & Boat


Correct Option: C

Choose any one answer from the multiple choice

  1. Homeowners

  2. Homeowners, Renters & Condo

  3. Renters

  4. Homeowners & Renters


Correct Option: B

Choose any one answer from the multiple choice

  1. Product: MC; Coveareg: PP

  2. Product: MC; Coveareg: MC

  3. Product: MC; Coveareg: MM

  4. Product: S3; Coveareg: MC


Correct Option: B
- Hide questions