Question 1 Multiple Choice (Single Answer)

Which include status review meetings and design and code inspections?

  1. Informal interpersonal procedures
  2. Formal interpersonal procedures
  3. Electronic communication
  4. Interpersonal networking
  5. Initiation stages
Question 2 Multiple Choice (Single Answer)

In which organization, work is often coordinate electronically, while systems enable information to more easily move around the organization and decentralizing decision making?

  1. Light weighted matrix organization
  2. Project organization
  3. T-form organization
  4. Network organizational architecture
  5. Heavy weighted matrix organization
Question 3 Multiple Choice (Single Answer)

Which is a hierarchic decomposition of a project or major activity into successive levels?

  1. Work breakdown structure
  2. Manageable task
  3. PERT chart
  4. Interoperability
  5. Controlling
Question 4 Multiple Choice (Single Answer)

Which model accommodates life cycle evolution, growth and requirement changes?

  1. Waterfall model
  2. Incremental model
  3. Automated software synthesis
  4. Spiral model
  5. Manageable task
Question 5 Multiple Choice (Single Answer)

Which is invoked to equate the cost estimate to the available resources?

  1. Top down estimation
  2. Algorithmic models
  3. Parkinson's principle
  4. Project planning
  5. Pin downs sofware requirements
Question 6 Multiple Choice (Single Answer)

In which cost estimation method, each componenet of the software job is separately estimated and the results aggregated to produce an estimate for the overall job?

  1. Algorithmic models
  2. Top down estimation
  3. Project planning
  4. Establish objectives
  5. Bottom up estimation
Question 7 Multiple Choice (Single Answer)

Which can be used as a management tool as an early warning system to detect deficient or endangered progress?

  1. Earned value analysis
  2. The planned value
  3. Cost variance
  4. Accomplishments
  5. Cost performance index
Question 8 Multiple Choice (Single Answer)

In which mode, the project is developed in a familiar, stable environment, and the product is similar to previously developed products?

  1. Semidetached mode
  2. Organic mode
  3. Embedded mode
  4. Project planning
  5. Annual change traffic
Question 9 Multiple Choice (Single Answer)

Which are indirect measures of software which focus on functionality and utility?

  1. Project metrics
  2. Size-oriented metrics
  3. Project cost results
  4. Function oriented metrics
  5. Accomplishments
Question 10 Multiple Choice (Single Answer)

In which, the engineering process of understanding, analyzing and abstracting the system to a new form at a higher abstraction level?

  1. Reverse engineering
  2. Forward engineering
  3. System engineering
  4. Data name rationalization
  5. Re-documentation
Question 11 Multiple Choice (Single Answer)

In which MIS approach, individual functional applications are planned separately consisting of transaction processing, updating of files and simple reports?

  1. Top down approach
  2. End user development approach
  3. Prototyping approach
  4. Bottom up approach
  5. Internal sources
Question 12 Multiple Choice (Single Answer)

In which organization, the line of authority flows vertically from the top most executive to the lowest subordinate?

  1. Networked organizational structure
  2. Project organization
  3. Scalar organization
  4. Light-weighted matrix organization
  5. The project
Question 13 Multiple Choice (Single Answer)

In which organization, all activities in the organization are grouped together according to basic functions like production, marketing, finance, human resource etc.?

  1. Light-weighted matrix organization
  2. Project organization
  3. The process
  4. Functional organization
  5. Heavy-weighted matrix organization
Question 14 Multiple Choice (Single Answer)

Which system's purpose is to record, process, validate and store operations that take place in various functional areas of business?

  1. Transaction processing system
  2. Office automation system
  3. Electronic calendering
  4. Executive inforrmation system
  5. Vediotext
Question 15 Multiple Choice (Single Answer)

Which information is generated at regular intervals of time?

  1. Non recurring information
  2. Internal information
  3. External information
  4. Timeliness
  5. Recurring information
Question 16 Multiple Choice (Single Answer)

Which systems are well integrated systems that store, retrieve and process different types of data such as text, graphics, images, full motion video, audio and animation?

  1. Office automation systems
  2. Multimedia system
  3. Executive information systems
  4. Word processing
  5. Query support
Question 17 Multiple Choice (Single Answer)

Which databases help to store the data where it is most needed or used, and help to customize the data to meet the needs of individual business units?

  1. Object oriented database
  2. Relational database
  3. Entity
  4. Distributed database
  5. Client server architecture model
Question 18 Multiple Choice (Single Answer)

Which information is available in some written form, microfilm, magnetic tapes, floppy disks, pen drive etc.?

  1. Non documentary information
  2. Documentary information
  3. Internal information
  4. External information
  5. Non recurring information
Question 19 Multiple Choice (Single Answer)

Which decisions are unstructured, occasional of high consequence, complex and involve major commitments?

  1. Semi programmed decision
  2. Perfect ones decisions
  3. Highly pleasing ones decisions
  4. Design
  5. Non programmed decisions
Question 20 Multiple Choice (Single Answer)

Which model promotes flexibility and data accessibility, since data elements at a lower level can be accessed without accessing the data elements?

  1. Relational model
  2. Object oriented database model
  3. Network model
  4. Record
  5. Client server architecture model
Question 21 Multiple Choice (Single Answer)

The sales analysis, accounts recievables system and market research analysis are the example of

  1. Information analysis system
  2. Status enquiry system
  3. Office automation system
  4. Executive information systems
  5. Electronic calendering
Question 22 Multiple Choice (Single Answer)

Which function of DSS helps managers to be proactive rather than reactive, in their decision making?

  1. Model building
  2. What-if analysis
  3. Goal seeking
  4. Support tools
  5. Intelligence
Question 23 Multiple Choice (Single Answer)

In which organizational structure, key decisions are made at the top and filter down through the organization?

  1. Networked organizational structure
  2. Heavy-weighted matrix organization
  3. Project organization
  4. Light-weighted matrix organization
  5. Hierarchical organizational structure
Question 24 Multiple Choice (Single Answer)

Which models have clarity to the extent that each of them has a set of assumptions, which must be true in real life?

  1. Trend analysis model
  2. Management science models
  3. Operations research models
  4. Relational model
  5. Attributes
Question 25 Multiple Choice (Single Answer)

In which development life cycle model, the approach is to construct a quick and dirty partial implementation of the system during or before the requirement phase?

  1. The incremental model
  2. Automated software synthesis
  3. Waterfall model
  4. Throw-away prototyping model
  5. Project planning
Question 26 Multiple Choice (Single Answer)

Which helps in scheduling the activities of a project, but it does not help in identifying them?

  1. Gantt chart
  2. Manageable task
  3. PERT chart
  4. Project planning
  5. Accomplishments
Question 27 Multiple Choice (Single Answer)

Which must correspond to whatever was budgeted for the planned value and the earned value?

  1. The planned value
  2. The actual cost
  3. Cost variance
  4. Schedule variance
  5. Negative cost variance
Question 28 Multiple Choice (Single Answer)

Which method involves reasoning by similarity with one or more completed projects to relate their actual costs to an estimate of the cost of a similar new project?

  1. Analogy estimation
  2. Top-down estimation
  3. Algorithmic models
  4. Price to win
  5. Cost variance
Question 29 Multiple Choice (Single Answer)

In which, the examination and alteration of an existing subject system to reconstitute it in a new form?

  1. System engineering
  2. Software reengineering
  3. Forward engineering
  4. Data name rationalization
  5. Re-documentation
Question 30 Multiple Choice (Single Answer)

Which is a branch of computer science whose goal is to design and develop machines that emulate human brain power?

  1. Expert system
  2. Executive information system
  3. Artificial intelligence
  4. Office automation systems
  5. Management information system