Feasibility (System Analysis)

This test covers questions form the topic of the feasibility study of a software and the role of system analyst.

15 Questions Published

Questions

Question 1 Multiple Choice (Single Answer)

In which of the following feasibility studies is the cost/benefit analysis done?

  1. Market research
  2. Social feasibility
  3. Technical feasibility
  4. Economic feasibility
  5. Operational feasibility
Question 2 Multiple Choice (Single Answer)

Which of the following tools shows the flow of data through a system?

  1. DFD
  2. State diagram
  3. EPC
  4. Activity diagram
  5. Pseudocode
Question 3 Multiple Choice (Single Answer)

Which of these is not a responsibility of a system analyst?

  1. Brainstorming of clients/users
  2. Gathering information for the existing documents
  3. Preparing questionnaires
  4. Evaluation of the gathered information
  5. Designing the proposed system
Question 4 Multiple Choice (Single Answer)

Which of these documents is prepared by a system analyst?

  1. System design document
  2. Test plan
  3. Software requirement specification
  4. Installation report
  5. Detailed design document
Question 5 Multiple Choice (Single Answer)

What is the end product of the feasibility analysis?

  1. SRS
  2. Error report
  3. Manuals
  4. Feasibility report
  5. Project plan
Question 6 Multiple Choice (Single Answer)

Which of these tools is generally used by the analyst for documenting the functional requirements for a system?

  1. DFD
  2. Prototyping
  3. Use case
  4. State diagram
  5. Activity diagram
Question 7 Multiple Choice (Single Answer)

In which analysis technique is a model of the system under analysis created?

  1. Questionnaire
  2. Information gathering from documents
  3. Talking to the perspective users
  4. Prototyping
  5. Analysing the manual system
Question 8 Multiple Choice (Single Answer)

What are the statements which form an informal statement of the requirement called?

  1. Use cases
  2. User story
  3. Prototype
  4. Stakeholder interview
  5. Questionnaire
Question 9 Multiple Choice (Single Answer)

Which of these is a measure of how reasonable the project timetable is?

  1. Legal feasibility
  2. Operational feasibility
  3. Economic feasibility
  4. Technical feasibility
  5. Schedule feasibility
Question 10 Multiple Choice (Single Answer)

Which of these activities is not undertaken by an analyst?

  1. Researching problem
  2. Plan a system flow from the ground up
  3. Interact with internal users and customers
  4. Coding
  5. Write technical requirements
Question 11 Multiple Choice (Single Answer)

Which study measures the effectiveness of a proposed system to solve the problems?

  1. Operational feasibility
  2. Technology and system feasibility
  3. Legal feasibility
  4. Economic feasibility
  5. Technical feasibility
Question 12 Multiple Choice (Single Answer)

Which of these should not be part(s) of the feasibility report?

  1. A cost/ benefits analysis
  2. Human and economic factors
  3. A description of the present technical resources of the organisation
  4. An estimate of how long the system will take to develop
  5. An algorithm for the development of the system
Question 13 Multiple Choice (Single Answer)

Which study examines the marketability of the product?

  1. Resource feasibility
  2. Market research study and analysis
  3. Cultural feasibility
  4. Economic feasibility
  5. Technology and system feasibility
Question 14 Multiple Choice (Single Answer)

Copyright legislation comes under the scope of

  1. cultural feasibility
  2. technical feasibility
  3. market and real estate feasibility
  4. schedule feasibility
  5. legal feasibility
Question 15 Multiple Choice (Single Answer)

What is the main objective of the feasibility study of a system?

  1. To enhance the problem
  2. To determine whether the problem is worth solving
  3. To plan a solution
  4. To detect errors in the system
  5. To code the system