A manufacturing shop processes sheet metal jobs, wherein each job must pass through two machines (M1 and M2, in that order). The processing time (in hours) for these jobs is give in the table:

The optimal make-span (in hours) of the shop is
Reveal answer
Fill a bubble to check yourself
