aliensbrain
  • Home
  • Study
  • Quizzes
  • 🎤AI Practicefree
  • Notebooks
  • Community
  • Sign in
  • Civil Engg. (GATE) 2011
  • The cumulative arrival and departure curve of one cycle o...
Multiple choice

The cumulative arrival and departure curve of one cycle of an approach lane of a signalised intersection is shown in the adjoining figure. The cycle time is 50 s and the effective red time is 30 s and the effective green time is 20 s. What is the average delay?

  1. 15 s

  2. 25 s

  3. 35 s

  4. 45 s

Reveal answer Fill a bubble to check yourself
A Correct answer

Keep practicing — related questions

  • Design parameters for a signalised intersection are shown in the figure below. The green time calculated fo...
  • The probability that k number of vehicles arrive (i.e. cross a predefined line) in time t is given as$(\lam...
  • Three traffic lights at crossings change colour after every 50 seconds, 35 seconds and 30 seconds respectiv...
  • Directions: Choose the one which substitutes the given phrase/sentence. A woman having more than one husban...
  • Directions: The statement below is followed by five others. Select the one which most complements the idea ...
  • Which of the following events is/are correctly matched with time period of a normal menstrual cycle?
  • A pink ribbon symbol similar to the red one for AIDS is related to _______________.
  • If a bacterial cell divides every minute, it takes 59 minutes to fill one half of the cup. How much time wo...
Play the full quiz 🎤 Practise this topic out loud
Advertisement
© Aliensbrain | all rights reserved
  • About
  • Contact
  • Terms and Condition
  • Privacy Policy