Multiple choice The two levels of material control are quantity control and financial control value control quality control both (2) and (3) all of the above Reveal answer Fill a bubble to check yourself A Correct answer Explanation Material control is generally divided into quantity control (ensuring the right amount is available) and financial/value control (ensuring the cost of materials is monitored and optimized).