Multiple choice general knowledge science & technology

How many Engineering drawings were used to produce the first Boeing 747..?

  1. 20,000

  2. 25,000

  3. 50,000

  4. 75,000

Reveal answer Fill a bubble to check yourself
D Correct answer
Explanation

The Boeing 747 jumbo jet required approximately 75,000 engineering drawings for its production, reflecting its immense complexity as the world's first wide-body airliner. This enormous number of technical documents was necessary to manufacture over 4.5 million parts.