Targeted power capacity addition for 11th plan period is -

  1. 41110 MW

  2. 66463 MW

  3. 68963 MW

  4. 86283 MW

Reveal answer Fill a bubble to check yourself
B Correct answer
Explanation

The 11th Five Year Plan (2007-2012) set an ambitious target for power capacity addition, which was officially recorded as 66,463 MW.

Keep practicing — related questions

  • National Electricity Policy, envisages elimination of power shortage by 2012 through addition of _______ du...
  • In 2010, the Planning Commission lowered the power generation target for the 11th Five Year Plan. What was ...
  • To how many megawatts did the Kundoh Project expand from 425 MW?
  • What is the power capacity installed by the Hirakud dam?
  • Consider the following statements: 1. The thermal power plant of India with the highest installed capacity ...
  • Consider the following statements: (a) The method of surgical operation in female where fallopian tube is c...
  • Which of the following five year plan periods is not correct?
  • The International Union of Pure and Applied Chemistry announced addition of elements with atomic numbers 11...
Play the full quiz 🎤 Practise this topic out loud

Practice this topic

  • Power, Energy, and Efficiency (463 questions)
Advertisement
© Aliensbrain | all rights reserved
  • About
  • Contact
  • Terms and Condition
  • Privacy Policy