Consider the following facts:
- This power station became critical on 3rd September, 1992 and began commercial electricity production on 6th May, 1993.
- It lies in proximity to Surat in Gujarat.
- In 1998, the plant was switched off because of a leakage in the cooling loop for 66 days.
Which power station is being talked about in the above statements?
Reveal answer
Fill a bubble to check yourself