Which of the following audits is held to verify the consistency of the design?

  1. Process audit

  2. Physical audit

  3. Preliminary design review

  4. Software requirements specification review

  5. Verifiability

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Process audit of a sample design is held to verify the consistency of the design.

Keep practicing — related questions

  • Which of the following is held to verify that all the requirements in the software requirements specificati...
  • Which of the following is held to verify that all requirements in the software requirements specification h...
  • In which of the following is the execution of the quality plan evaluated followed by its review?
  • Which of the following is a more precise language that will ensure the correct design and implementation wo...
  • Which of the following means of system evaluation measures the consistency of the product requirements with...
  • The Verification process
  • Which of the following is used to ensure that the client's requirements have indeed been met?
  • Which condition that is inconsistent with development procedures aw well as other code problems is identifi...
Play the full quiz 🎤 Practise this topic out loud

Practice this topic

  • Software Development and Management (3064 questions)
Advertisement
© Aliensbrain | all rights reserved
  • About
  • Contact
  • Terms and Condition
  • Privacy Policy