When average cost is at its minimum point, marginal cost equals average cost. This is the mathematical relationship: MC intersects AC from below at AC's minimum. Before the minimum, MC < AC (pulling average down). After the minimum, MC > AC (pulling average up). At the minimum itself, MC = AC.