A man undertakes to do a certain work in 150 days. He employs 200 men. He finds that only a quarter of the work is done in 50 days. The number of additional men that should be appointed so that the whole wok will be finished in time is : एक व्यक्ति एक कार्य 150 दिनों में पूरा करने के लिए लेता है। उसमें वह 200 व्यक्ति नियुक्त करता है। उसे पता चलता है कि 50 दिनों में केवल एक-चौथाई काम पूरा हुआ है। तदनुसार वह कार्य निश्चित समय पर पूरा करने के लिए, उसे कितने व्यक्ति अतिरिक्त नियुक्त करने होंगे?

  1. 100

  2. 125

  3. 50

  4. 75

Reveal answer Fill a bubble to check yourself
A Correct answer
Explanation

Work rate calculation: 200 men complete 1/4 work in 50 days. Remaining work = 3/4 in 100 days. Let M be total men needed. Work done = M × 100 days. For 3/4 work: M × 100 = 3/4 × 200 × 200 (from initial rate). This gives M = 300, so 100 additional men are needed. Alternatively: Work = 200 × 50 / 0.25 = 40000 man-days. Remaining = 30000 in 100 days, requiring 300 men.